- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程测量期末考试卷及答案(Final examination paper and answer)
工程测量期末考试卷及答案(Final examination paper and answer) 2011-2012 autumn Fill in the blanks, will proper words to fill in line. A total of 20 1, the north and south direction measurement using plane rectangular coordinate system based on the longitudinal axis of the X axis to things in the direction of the horizontal axis for the Y axis. 2. The basic work of measurement is high difference measurement, horizontal Angle measurement and distance measurement. 3 field measurement datum is plumb line datum is the geoid. Measuring work in the industry of datum line is normal datum is rotating reference ellipsoid. 4, at present our country 1985 national height datum to benchmark the origin of the height of 72.260 m level The standard English symbol BM. 5, ground point to assume that the geoid The vertical distance is called the relative elevation this point A point on the geoid the absolute elevation of point A is zero. 6, leveling point was defined as elevation after known points in turn point is passed elevation point. 7. Telescopic visual axis refers to the connection of the intersection of objective and cross wires. 8. The purpose of the rotating objective for the operation of the instrument is clear. The purpose of rotating eyepiece to light spiral is clear cross. 9 in the process of the theodolite is the place for the purpose is to instrument center and measuring on the site is located in the same vertical line The purpose of leveling is vertical axis lead vertical, horizontal disk level. 10, A level measurement known point A height of 241.000 m before reading of 0.938 m after reading of 1.438 m Point B of the height of 241.500 m the line of sight of instrument height is 242.438 m. Over a horizontal Angle of the 11, back to measuring need to target readings are starting to plate processing 180 ° / n In order to eliminate the error caused by uneven plate drawing. , poor vertical plate index X 12 but belong to instrument error mea
您可能关注的文档
- 基坑开挖强制性条文(Mandatory provisions of foundation pit excavation).doc
- 基础工程答案(Basic engineering answer).doc
- 基础报价(Based on offer).doc
- 基础装修报价单(Basic decoration quotation).doc
- 基础题三(Basic question three).doc
- 堵漏技术(Plugging technology).doc
- 堵漏图片图片(Block pictures of pictures).doc
- 基装包含的材料(The material contained in the base pack).doc
- 基础题二(Based on question 2).doc
- 塑料 常用物理性能简释(Plastic is commonly used in physical properties).doc
- 工程测量论文(Engineering surveying paper).doc
- 工程测量(Engineering surveying).doc
- 工程测量员-RTK测高试验与精度分析(Engineering surveyor - RTK test and precision analysis).doc
- 工程现场文明及安全施工标准(Engineering site civilization and safety construction standard).doc
- 工程经济课后答案(After-school answers to engineering economics).doc
- 工程经济6(Engineering economy 6).doc
- 工程测量试卷A卷期末试题(Project A book A final exam).doc
- 工程结构脆性断裂事故分析(Analysis of brittle fracture accident of engineering structure).doc
- 工程结构(Engineering structure).doc
- 工程规划~城市设计道路管网~(Project planning ~ urban design road network).doc
最近下载
- 探究感应电流的产生条件导学案.doc VIP
- 7的乘法口诀教学设计【省一等奖】.docx
- Hasselblad哈苏相机X2D II 100C User Manual - 简体中文用户手册说明书(中文版).pdf
- 中国计量大学803传感器技术1--2011--2020年考研初试真题.pdf VIP
- 参保单位派出证明.docx VIP
- 2025届安徽省“江南十校”高三联考英语试卷(含官方答案)原卷.pdf
- DB23_T(1621.10-1621.14)-2015:黑龙江省建设工程施工操作技术规程(三).pdf VIP
- 12YJ1工程用料做法.docx VIP
- 中考冲刺励志文案【90句】.pdf VIP
- 05175税收筹划自考课程.docx VIP
文档评论(0)