三峡电站水轮机性能和结构特点评析(The performance and structure of the water turbine of the three gorges hydropower station are analyzed).docVIP

三峡电站水轮机性能和结构特点评析(The performance and structure of the water turbine of the three gorges hydropower station are analyzed).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
三峡电站水轮机性能和结构特点评析(The performance and structure of the water turbine of the three gorges hydropower station are analyzed)

三峡电站水轮机性能和结构特点评析(The performance and structure of the water turbine of the three gorges hydropower station are analyzed) Analysis of the performance and structure of water turbine in three gorges hydropower station Huang yuanfang li literature The three gorges project is a huge investment, and the only way to recycle it is to generate electricity from the three gorges hydropower station. As one of the core equipment of the power plant, the water turbine is the key to the performance of the project. The three gorges water turbine has a rated output of 710MW and the wheel diameter reaches 10m. It is the largest and largest mixed flow turbine in the world. The structural design and manufacturing process of large-sized mixed-flow hydraulic turbine is also a technical challenge. Based on the three gorges hydraulic turbine model test, this paper introduces and analyzes the structural features and characteristics of the main components of the three gorges water turbine. Keywords: three gorges project hydraulic turbine performance structure The three gorges hydropower station has a total of 26 hydropower stations with a rated capacity of 700MW. The 14 units of the left bank power station signed the contract in September 1999 through international public bidding and bidding. 14 units rated head of 80.6 m, the rated output of 710 mw mixed-flow turbine respectively by two group is responsible for the supply, VGS joint (German Voith GEHydro, Canada, Germany Soemems) received 6 sets of contract, French AISTOM group obtained 8 sets of contract. The contract two group adopt their own hydraulic design, VGS using the hydraulic model of joint development, AISTOM were asked to use the Norwegian KVAERENER energy company (hereinafter referred to as KEN) developed by hydraulic model. The most common thing the two models have in common is that the rotor blades are x-shaped blades. 1. Characteristics of water turbine performance of three gorges The design and manufacturing contract of the

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档