预应力连续T梁设计计算说明书.doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘 要 方案比选依据安全、实用、经济、美观的原则,最终选择方案二是预应力钢筋混凝土简支转连续T型梁桥为推荐方案,该方案梁高为1.8m。主梁内力计算时分别对简支体系和连续体系进行计算,既保证了施工中的安全又保证了成桥以后的使用安全。在张拉预应力时采用后张法两端张拉,然后再进行孔道压浆,在计算预应力损失时,由于采用后张法,不考虑第三项损失。 本设计桥梁下部结构为双柱式墩,基础采用钻孔灌注桩基础。本设计仅对桥墩进行了配筋及强度验算。 关键词:预应力,连续梁桥,桥墩,桩基础 Abstract The Xiangfan of Hubei to Shiyan freeway of The First of Sanchahe bridge site the federal of hurong highway host skeleton line section K431+230 place, what overstrides the Youxi. River and courseand route orthogonal, river bed is stable, the river course is suitable straight, Usually in the ditch the water volume is less, ditch sole deeper,gradient bigger, the flood discharge is smooth. This bridge planelinear is a straight line, with running water direction orthogonal. As well as gave the material according to the terrain to design three compared to choose the plan, the plan one is Y the shape column the king post rigid frame bridge, the plan two uses the box shape empty stomach arched bridge, the plan three is continuously the pre-stressed continuous bridge. The plan compared to chooses the basis safely, practical, economical, the artistic principle, finally chooses the plan three is the pre-stressed continuous bridge is the recommendation plan, This plan uses a box of two room constant section continuous bridge, The altitude of king post is 1.8m. Calculation of Internal Forces of the main beams were simply supported at the system and continuous system, the purpose is to ensure the safety of the construction of the bridge and ensure the safe use of the future. In the use of tensioned prestressed post-tensioned tensioned at both ends, and then grouted to channel in the calculation of prestress losses, as a result of the use of post-tensioned, the third loss is not considered. The bridge substructure is the bridge pier pillar, The foundation uses the drill hole to pour into pile foundation.This design only carried on to the bridge pier has matched the muscle and the intensity checking calculation. Key words :Pre-str

文档评论(0)

新起点 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档