调车类实作考试题库(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
调车类实作考试题库(国外英文资料)

调车类实作考试题库(国外英文资料) Shunting practice examination question bank The provisions of the four, and four are not allowed to ask the, what is the specific content of four allowed? Answer: four no: a focus on control of shunting operation range, shunting on control of personnel not to post the operation should not be carried out, the shunting operation plan no audit signature operation should not be carried out; do not convey the shunting operation plan, shunting personnel is not clear, the operation should not be carried out; shunting personnel not neat, not enough manpower, the operation should not be carried out. In shunting operation, what four necessary systems should be implemented? (electric trains into 2012 No. 59) Answer: hair line shunting, Yardmaster must get the station attendant (signalman) approach is ready to inform, and push the front end of the connecting member crew site to confirm the shunting signal has been open to the report before being sent out to advance directives; In the course of the train procession, shunting personnel must be responsible for the lookout at the front; When the shunting operation of the intermediate station is carried out, all the wind pipes must be connected and the test and pull system shall be implemented; At the end of the line push operation must implement from the car block or at the end of the 30 meters once parking regulations. In shunting operation, what situations need to be tried and pulled? Answer: (1) when push a vehicle, must try to pull first. There should be a lookout at the front of the train to show the signal in time. (2) continuous connection, the distance between the car in the 10 car and above, to try to pull or hook up; (3) trains, in marshalling (fat) line originating directly, the last hook must try to pull; line originating, to try to pull the line before the line; sit train, the last hook must pull test. What are the shunting operations that affect the train route? Answer: take the train route or throu

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档