砖墙的组砌要求(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砖墙的组砌要求(国外英文资料)

砖墙的组砌要求(国外英文资料) 1. material requirements (1) brick: variety, strength level must comply with the design requirements, and have the factory certificate or test list. The brick of the clean water wall should be uniform in color and tidy in edges and corners. (2) cement: the variety and grade should be chosen according to the place of masonry and the environment. Generally, 325 Portland cement or slag Portland cement should be adopted. (3) sand: medium sand, preparation of mortar below M5, the sand content of sand shall not exceed 10%. Sand content of mortar over M5 and above shall not exceed 5%. Sieve shall be screened with 5mm aperture before use. (4) admixture: lime paste curing time of not less than 7d, prohibited the use of dehydration hardening and freezing lime paste. (5) other materials: wood brick wall brush preservative; Rachel reinforced and embedded parts etc.. 2. main machines and tools Must have a mixer, trolleys, scales, vertical transportation equipment, big shovel, adze, tile, flat, supporting board, wire, small white, tape, iron ruler, leather pole and a small bucket, ash groove, brick clip, broom etc.. 3. operating conditions (1) complete the outdoor and inner core backfill, and install the heating panel. (2) completing the hidden inspection procedures of the foundation and infrastructure works. (3) apply cement mortar damp proof layer according to the elevation. (4) the bomb line, good wall axis, according to the actual size of the brick, then pop-up windows and doors position line, line experience according to design drawing size requirements, through pre screening procedures. (5) according to the elevation, the number of leather poles and the number of leather poles should be between 15 and 20m. (6) the mortar shall be well tested and ready to be tested. 4. operation process Technological process: Job preparation: Brick watering, mortar mixing, masonry brick wall - Acceptance (1): watering brick clay brick must be watered the day before laying we

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档