- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挖空桩平安(国外英文资料)
挖空桩安全(国外英文资料) Engaged in digging pile workers should choose healthy young men, and subject to the health examination and underground, high altitude, electricity, hoisting and simple mechanical operation and safety operation training and pass the examination before entering the construction site. 2) in the construction drawings and the pile hole excavation, seriously study the geological data, the possible The flow of sand, piping, gushing water and harmful gases which should be paid attention to, and formulate specific protective measures. If there is any doubt about the safety construction, the report should be submitted to the relevant units in a timely manner. 3) to investigate the change of the ground and adjacent slope when the excavation of the pile hole is started. Pile construction platform near the slope, slope reinforcement measures must be clear, on the slope of Boulder, upper side ditches and safety net, to prevent the rain soaked and boulder rolled down the slope. The excavated earthwork shall be sent in time. No debris shall be piled up within the 2m range around the orifice. To prevent personnel and objects from falling into the pile hole, the fence and safety net must be provided around the hole (except for the excavation site of the wellhead). The mixing personnel should concentrate their efforts, closely monitor the situation in the hole, and actively cooperate with the personnel working in the hole, so as to leave the post during construction. When delivering tools and objects in the hole, the throwing is strictly prohibited; the object of the orifice is prevented from falling into the pile hole. 4) construction site all power supply, electrical installation and dismantling, must be operated by a licensed electrician; electrical appliances must be strictly grounding, grounding and use leakage protector, switch box and distribution room special, a rain cover and canopy, and equipped with fire fighting facilities. Electrical equipment must have a c
您可能关注的文档
- 山地车选购指南(国外英文资料).doc
- 山东专升本计算机文化基础课后题答案第5章(国外英文资料).doc
- 岛津GC-17A 气相色谱仪操作规程(国外英文资料).doc
- 山东省住宅建筑设计标准(DBJ14-S1-97)(国外英文资料).doc
- 川大2014春《建筑材料》第一次作业答案(国外英文资料).doc
- 川大《工程估价(ⅰ)2414》13春在线作业2(国外英文资料).doc
- 川大《建筑安装与市政工程估价1619》13春在线作业2(国外英文资料).doc
- 工业设备与管道保温工程施工方法浅析(国外英文资料).doc
- 山东日照自助游攻略(国外英文资料).doc
- 工业自动化发展 PLC共性平台不可或缺(国外英文资料).doc
文档评论(0)