- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
抹灰工程施工顺序(国外英文资料)
抹灰工程施工顺序(国外英文资料)Plaster WorkJob requirements:1. structural engineering has been completed, and acceptance by the relevant departments, to meet the standards and play the 500mm line.2. check the door and window before plastering. The location of the hole is correct.3., the basic surface dust, dirt and grease, etc. should be cleaned up, before plastering a day ahead of the wall sprinkling wet.4., all kinds of embedded iron pieces, pipe, ring and so on should be installed in advance, the structural concrete deviation parts should be flattened or repaired in advance.5., the walls of masonry, lack of edges, the corner of the need for hierarchical treatment, water, electric wall, buried pipe, picking groove parts, with special personnel to repair, repairFill when the first rinse water tank float ash, then you will be a building glue brush, followed by cement mortar filling to flat wall.6., internal and external walls of cement mortar, a large area should be done before the model, the owners, supervision units identified, and then organize the construction.7. in the construction of the outer frame should be prepared in advance, they will leave the wall and the corner bar 200~250mm, to facilitate the operation. In order to reduceTo ensure the smooth ash plastering joint, the outer frame should be laid down the three step board, to meet the requirements of construction.8. before plastering, the basic surface shall be checked to determine the thickness of the plastering, and shall be displayed on both sides of the ledge on both sides of the big horn before plasteringThe control line of the ash layer for backing.Technological processThe door and window frame is surrounded by caulking (or vertical and horizontal joints)Impact bar, ash layer, control line, base treatment, floor mortar, elastic line, dividing lattice, sticking, dividing bar, wiping surface and curingA. primary treatment: if the surface is smooth, with its texturing surface is smooth, clean, with a broom throwing
您可能关注的文档
- 山地车选购指南(国外英文资料).doc
- 山东专升本计算机文化基础课后题答案第5章(国外英文资料).doc
- 岛津GC-17A 气相色谱仪操作规程(国外英文资料).doc
- 山东省住宅建筑设计标准(DBJ14-S1-97)(国外英文资料).doc
- 川大2014春《建筑材料》第一次作业答案(国外英文资料).doc
- 川大《工程估价(ⅰ)2414》13春在线作业2(国外英文资料).doc
- 川大《建筑安装与市政工程估价1619》13春在线作业2(国外英文资料).doc
- 工业设备与管道保温工程施工方法浅析(国外英文资料).doc
- 山东日照自助游攻略(国外英文资料).doc
- 工业自动化发展 PLC共性平台不可或缺(国外英文资料).doc
文档评论(0)