- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
拉索钢结构雨棚施工计划(国外英文资料)
拉索钢结构雨棚施工方案(国外英文资料) Steel structure canopy basis: 1. structures load code 2. steel structure design code GB50017-20033. glass curtain wall engineering technical specifications 4. code for seismic design of buildings, a process for preparation and blanking, measurement line, installation of embedded parts processing, welding, installation and calibration of suspension arm and cable force to install the stainless steel glass claw welding, painting antirust processing, laminated glass processing manufacture and installation, inspection and adjustment on the glue to repair inspection, glass cleaning, cleaning up the site connected to completion and acceptance. Two, construction technology and construction points: A, processing, preparation and blanking: according to the construction plan lofting, lofting and marking materials should be provided for welding shrinkage and processing allowance, according to lofting as a model. Steel correction: the steel must be corrected before the material is removed, and the deviation value after correction shall not exceed the allowable deviation value of the specification so as to ensure the quality of the blanking. Hot worked sections are heated first and then replaced by holes after cooling. Cutting steel embedded parts and other parts of drilling and anti-corrosion spray paint processing. B, measurement line: according to the construction elevation datum line elevation measuring embedded parts center line, check the elevation deviation and deviation around embedded parts. Results, determine the separate adjustment scheme of embedded parts. Along the floor edge pop-up set the standard high top line embedded parts. C, installation of embedded parts processing: positioning embedded parts installation position, drilling and installation. Requirement of accurate position and firmly embedded embedded parts. Elevation deviation is not greater than 9mm, about displacement is not greater than 20mm. D, suspension arm installation welding: s
您可能关注的文档
- 山东省求职网站(国外英文资料).doc
- 山东日照市第二实验中学开展“说学”活动的体会_1317(国外英文资料).doc
- 山东招聘网站网址(国外英文资料).doc
- 山东轻工业学院毕业设计(论文)教学(国外英文资料).doc
- 山地车选购指南(国外英文资料).doc
- 山东专升本计算机文化基础课后题答案第5章(国外英文资料).doc
- 岛津GC-17A 气相色谱仪操作规程(国外英文资料).doc
- 山东省住宅建筑设计标准(DBJ14-S1-97)(国外英文资料).doc
- 川大2014春《建筑材料》第一次作业答案(国外英文资料).doc
- 川大《工程估价(ⅰ)2414》13春在线作业2(国外英文资料).doc
文档评论(0)