- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程报建手续(国外英文资料)
建筑工程报建手续(国外英文资料)
Building Gongchengbaojian procedures.Txt
Building engineering construction procedures
A project: (Sino foreign joint ventures, wholly foreign-owned project 1), application (zone approval, District Planning Commission approved); 2, construction land location map; 3, the feasibility study report and approval copy; 4, a company set up a copy of approval (economic and Trade Commission, 5); a photocopy of the business license; 6, copies of verification report. Two, civil air defense approval: 1, air defense basement building design registration form (to the civil air defense office to receive); 2, project, review, approval and other documents; 3, general plan and construction drawings (except factory buildings). Three, fire examination and approval: 1, building fire design fire audit application form (to the fire department to receive); 2, project, review, approval and other documents; 3, construction unit application report; 4, a full set of drawings. Four, planning approval: 1, construction planning permit application form (to the District Planning Bureau; 2, receiving) approval, review, approval and other documents; 3, civil air defense, fire approval approval form; 4 books; 5, two sets of construction plans: two sets of construction drawings, half is set to cover, directory, general layout, building flat vertical profile profile. The cover of the two sets of semi drawings shall be sealed by the design unit before it can be valid. Five, construction (construction permit):1, approval, review, approval, construction and other documents; 2 registration form; 3, construction planning permits; 4, design bidding and bid winning notice; 5, construction plan review approval; 6, construction bidding and bid winning notice; 7, survey and design contracts; 8 construction contract.
Planning: Planning Commission approval (1, 2, 3, investment planning: license approval form planning: the construction units, construction money sources 4, bureau of Statistics: fixed
文档评论(0)