- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工艺操作制度和安全操作规程(国外英文资料)
工艺操作制度和安全操作规程(国外英文资料)
The process operation system and safety operation procedures, electrolytic safety operation rules
1, work in the electrolytic cell, should stand on the edge of the groove plate or style board, slot cover should first check whether the visit trough cover on the stability, up should be on the cover of bone, are not allowed to take the foot in the crust or electrolyte anode carbon block to work.
2. The tools used for pole changing must be in good condition. Before use, we must understand its function and correct method of use, and fully preheat, and put it in the designated position after use.
3, artificial add raw materials into the tank, must be fully preheated drying, wet raw materials are not allowed to directly into the tank.
4, to replace the anode to effect, should immediately stop the pole change operation, until the effect is extinguished, after the electrolyzer stable, in order to carry out pole change operation.
5, artificial drilling operations, should wear protective masks, grasp force, to prevent the electrolyte splashing burns, such as the slot effect, aluminum and other work should immediately stop work.
6, no matter how hot workplace, do not allow red arm operations, homework must wear good labor protection supplies.
7, in the course of operation, labor protection products on fire should be immediately extinguished or removed, extinguished, can not run around, not to use water pouring.
8, from the groove to remove carbon residue block, we should pay attention to fishing methods, and grasp the direction and strength of efforts, the operation should be taken care of around the staff, in order to prevent injury to others. Check out the anode residue, do not put on the cement floor, should be placed on the residual tray, to burn the cement surface or other accidents.
9. When directing or coordinating the hoisting of objects, the crane shall check that the sling is in good condition and that the bundle is firm and that the personnel ar
您可能关注的文档
- 外地牌照上海通行限制(国外英文资料).doc
- 外架足手架技巧交底(国外英文资料).doc
- 外地牌照如何转成上海牌-操作流程详解(国外英文资料).doc
- 外汇交易的10大原则(国外英文资料).doc
- 外贸基础知识(国外英文资料).doc
- 外贸学习(国外英文资料).doc
- 外贸常识-看看你懂多少(国外英文资料).doc
- 外贸,一年挣30万美元的经验(国外英文资料).doc
- 外贸百宝箱(国外英文资料).doc
- 外贸小常识(国外英文资料).doc
- 巧用长方体和正方体的面、棱、顶点及体积、表面积公式(国外英文资料).doc
- 差速器与差速锁(国外英文资料).doc
- 工程量速算常用方法介绍(国外英文资料).doc
- 差速器的工作原理(国外英文资料).doc
- 已经灭绝的植物(国外英文资料).doc
- 已知:如图,AB是⊙O的直径,⊙O过AC的中点D,DE切⊙O …(国外英文资料).doc
- 巴戟天与四川虎刺鉴别(国外英文资料).doc
- 巴林左旗气象局屈国 气象部门基层台站科学发展观心得体会 - 中国气象局气象干部培训学院(国外英文资料).doc
- 巷战之王——“城市豹”与“梅卡瓦”4之比较(国外英文资料).doc
- 市情上的水蛭种类(国外英文资料).doc
文档评论(0)