- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PHC管桩基础施工常见质量问题的辨析(国外英文资料)
PHC管桩基础施工常见质量问题的辨析(国外英文资料)
Analysis of common quality problems in construction of PHC pipe pile foundation
Chen Xiao
[Abstract] the quality problems for pile foundation construction in common, the causation and relevant measures for in-depth analysis and elaboration, to strengthen the pile foundation construction quality management, improve the quality of the project, provide reference for optimizing construction method.
Pipe pile; construction design; control requirement; soil squeezing effect; pile spacing
Pile failure, bored pile, clamping force, stress concentration
0 Introduction
The PHC prestressed pipe pile foundation because of its short construction period, high bearing capacity of single pile, low cost, convenient monitoring, little influence on the environment and other advantages, in recent years has been widely used in Haikou, Sanya in the construction, many on the pile quality caused by this problem has attracted much attention. According to the construction experience of pile foundation engineering in recent years, the construction quality problem of pile foundation pile are not up to the design requirements of control; deviation of pile position and pile tilt rate exceed the standard; broken pile head; pile damage; single pile bearing capacity is not up to the design requirements. The author simply talks about the causes and Countermeasures of the pile failure in the construction of the tubular pile foundation.
1 the pile is not up to the design control requirement
1.1, the main reason why the pile fails to meet the design control requirements is that:
1.1.1 survey borehole density does not meet the requirements, the exploration report failed to provide accurate geological data; or the design selection of the bearing layer is improper or the design requirements are too high.
When the 1.1.2 pile is sinking, the underground obstacle or the hard interlayer is thicker.
1.1.3 piling hammer is too small, or pile hammer is old, hammer free fall is not smoot
您可能关注的文档
- 2014年河南省新乡市中考数学一模试卷 _20140612_170236(国外英文资料).doc
- 2014必威体育精装版版德福考试必备复习资料大全(国外英文资料).doc
- 2014年历史会考知识点(国外英文资料).doc
- 2014考研英语图表作文写作方法和模板(国外英文资料).doc
- 2014高考物理考点汇总(国外英文资料).doc
- 2013年创业公司若何寻到最适合的人才(国外英文资料).doc
- 2015年内蒙古专业技术人员继续教育答案(大全)(国外英文资料).doc
- 2012年西班牙马德里国际电子、电子装置及照明产品博览会(国外英文资料).doc
- 2016年美国芝加哥日用品消费品展会(国外英文资料).doc
- 20国港口特殊规定简介(国外英文资料).doc
最近下载
- 2024-2025学年初中信息技术(信息科技)七年级全一册义务教育版(2024)教学设计合集.docx
- 《眼耳鼻咽喉口腔科护理学》教案 第13课 耳鼻咽喉科常见疾病患者的护理(三).docx VIP
- 2025年江苏南京中考语文试卷(真题--含答案) .pdf VIP
- 统编版(2024)道德与法治七年级上册期末复习全册知识点提纲.docx VIP
- 建筑工程述标(鲁班奖项目超高层框架结构技术答辩).pptx VIP
- 混凝土结构通用规范GB55008-2021知识培训.pptx VIP
- 《电梯关键部件寿命评估技术规范》.pdf VIP
- 高压氧舱技术的进步与挑战.docx VIP
- 消防考试试题100题及答案.docx VIP
- 2025电力企业数字化转型成熟度评价指南.pdf VIP
文档评论(0)