- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电力专业英语第七讲分析
电力系统专业英语;词汇;课文内容;The Steam Turbine
The steam-mechanical energy conversion is a thermodynamic process by which the steam is expanded through the high-, medium-, and low-pressure turbines, normally all on one shaft. High-pressure and high-temperature steam energy from a boiler is converted into mechanical energy through the turbine blades, and transmitted to the shaft.
The steam-mechanical energy conversion蒸汽中能量与机械能的转换
thermodynamic process热动过程
Shaft转轴
turbine blades汽轮机叶片; ; the steam chamber in front of the high-pressure turbine, which causes a time delay of the steam flow; the reheater between the high-and medium-pressure turbines, which causes another time delay; and the crossover connection between the medium-and low-pressure turbines, which causes still another time delay of the steam flow. Many other types of steam turbines are in use.
the steam chamber蒸汽室
a time delay一个延时
Reheater再热器
crossover n. 转换器
?
;The Governor
The function of a governor of an electric power plant is to maintain a constant speed, usually the synchronous speed of the turbine-generator set. A speed drop of the set due to an increase of electric power output will send the speed signal to the governor to increase the mechanical power input to the turbine(s), and a speed rise to decrease the mechanical input, maintaining a constant speed.
Governor调节器;调速器
usually the synchronous speed of the turbine-generator set ?通常是配套汽轮机与发电机的同步转速
;The governor of the major plant of a power area or subsystem is also given the function of power and frequency control of the area in a large interconnected electric power system. The governor responds not only to the scheduled electric power interchange among areas, but also to the change in system frequency due to local load variations.
The governor of the major plant of a power area or subsystem 区域或地区电力系统主电站的调速器
in a large interconnected electric power system在一个大的电网系统
the scheduled electric power interchange计划的电能交换
local load variations当地负荷的变化;Another use
您可能关注的文档
最近下载
- 五星级酒店设计要点.pdf VIP
- SL319-2018 混凝土重力坝设计规范.docx VIP
- 《公司治理》期末考试复习题库资料(含答案).pdf VIP
- 2025年贵州省小升初入学分班考试数学试卷解析及答案.docx VIP
- 环保企业公司章程范本.docx VIP
- 工程建设标准-CJJ汇编-2023年7月版 (1).pdf VIP
- 内科学(继教)PPT课件 第五篇 泌尿系统疾病10第十章 慢性肾衰竭.pptx VIP
- (典例创新讲义)专题3百分数的认识(考点突破)2023-2024学年六年级下册小升初数学思维拓展提升讲义.docx VIP
- 2025年贵州省六盘水市小升初入学分班考试数学试卷解析及答案.docx VIP
- 资产评估服务项目工作计划与实施方案(技术方案).doc VIP
文档评论(0)