安钢2000级高炉全焦开炉创新实践(国外英文资料)
安钢2000级高炉全焦开炉创新实践(国外英文资料)
2000 steel grade blast furnace coke blowing in innovative practice
Xian Zhen Guo
1,2 at Hai Bin
1 Shaodang Valley
1, Shen Feng, full
Two
(1. Anyang iron and steel Limited by Share Ltd, Anyang 455000; 2. Northeastern University, Shenyang 110004)
Through the two seat of Anyang Iron and Steel Group
In practice 2000 blast furnace system from a new perspective comprehensive summary of Anyang Steel
2000 blast furnace technology, such as belt
Wind loading, bottom ignition, all coke furnace, iron installed in the ventilation pipe, introduced in detail to the blow in process from early in personnel, equipment, raw material and fuel preparation
Control, and start-up equipment before and after maintenance work.
Keywords blow all coke with wind loading bottom ignition
Innovation, Practice, of, Blow-in, with, Full, Coke, in
2000, Level, of, Blast, Furnace, in, Angang
Guo, Xianzhen1,2, Yu, Haibin1, Gu, Shaodang1, Shen, Fengman2
(1., Anyang, Iron, and, Steel, Stock, Company, Anyang, 455000, 2., Northeastern, University, Shenyang, 110004)
Abstract, This, paper, adopted, practice, of, blast, furnaces, of, two, m3,, level, from,, a, new, angle, summarizes, systemically
Technology, of, startup, in, big, blast, with, full, coke, in, Angang, such, as, loading, materials, with, wind, furnace, furnace, bottom
Ignition, blow-in, with, full, coke, tap, hole, with, ventilation, tube, installation, detailed, introduces, the, technology,, from, the
Furnace, prophase, personnel, equipment, raw, material, and, fuel, to, prepare, for, the, furnace, process, control, and, equipment
Maintenance work before blow-in.
Key, words, blow-in, with, full, coke, loading, with, wind, bottom, ignition
1 Introduction
Anyang iron and steel Limited by Share Ltd has two seats
Grade 2000m3 blast furnace, respectively
2005
October
15, 2007
06 month
In 28 days,
So far, two blast furnaces have experienced a falling surface shutdown and the blow in process. In the process of blow in two blast
您可能关注的文档
最近下载
- 济南版(2024)初中生物学七年级上册《脊椎动物身体背部有脊柱》教学设计及反思.docx
- 中铁建工集团质量管理手册.pdf
- 二级中医医院评审细则解读院感部分.pptx
- 2024年迪瑞医疗分析报告:强化协同,仪器放量布局市场.pdf
- 部编版初中道德与法治九年级上册单元作业设计 (优质案例12页) .pdf
- 广东实验中学2023-2024学年八年级上学期期中考试语文试卷.docx VIP
- 2020年世界发展报告:全球价值链时代的贸易换发展.pdf VIP
- 湖北省水利工程重大设计变更报告编制大纲.pdf
- 2024高中地理教师课程标准考试模拟试卷及参考答案.docx VIP
- 《材料成型工艺学》全套教学课件.ppt
文档评论(0)