- 1、本文档共22页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
02道路交通试题分类整理06往前(国外英文资料)
02道路交通试题分类整理06往前(国外英文资料)
Road traffic
The first road route
One, the introduction
Road transport features and road functions
Domestic and international road development profiles
The classification of the road
1, the urban road is divided into 1995,,,,, its function is.
In February 1997, the urban road traffic planning and design specification will be divided into city road,,,,
Four classes.
Second, the basis of road traffic:
Basic concepts - design vehicles, calculate speed of traffic, traffic, road traffic capacity, etc
1st 1995, road, is A pure motor vehicle road, no plane intersection, one-way two lanes, the measured speed of 40 km/h, passed the 1600 cars per lane/h, and the roads are B is A motor vehicles and non-motor vehicles driving road, lane segmentation in marking way, one-way three lanes (including two roads, one for non-motor vehicle lanes), A plane intersection traffic lights time evenly (both sides, the measured vehicle speed of 18 km/h, two-lane motor vehicle traffic capacity is less than 1600 m/h, trial learned basic theory and knowledge, A comprehensive calculation and analysis of (5 meters long known car driver reaction time of 0.7 seconds, road slope, road friction coefficient and other coefficient set).
The traffic capacity of a lane in 1997 is the value of the length of the unit time vehicle.
Transportation planning to predict the four steps of traffic on the road,
.
Traffic density:
In 2000, the structure of urban transportation:
Road service level in 2003:
In 2004, the traffic capacity of a bicycle path was density.
Road service:
The design speed of the road in 2005:
Usually in transit planning,
Four steps for traffic prediction.
11, the main factors influencing the traffic capacity including.
The survey found that a road vehicle was running very fast. Was the traffic on the road also large? Please explain why.
In 2006, the speed of the car in a city road was very fast. Does that mean that the traffic is certain? Give reasons for
Third, the roa
您可能关注的文档
- (宋明清建筑风格特征与代表构造).JPG(国外英文资料).doc
- (八年级数学)图形的全等(二)—全等三角形的识 …(国外英文资料).doc
- (平面设计人必备的封套尺寸)(国外英文资料).doc
- (人教)高中英语第二册下12单元测试题(国外英文资料).doc
- (电大毕业论文范文)对10例气管切开患者的临床医学论文发表(国外英文资料).doc
- (中秋节快乐)离散大家上机第2题(国外英文资料).doc
- (建筑工程)第1章3(国外英文资料).doc
- (第一卷)(国外英文资料).doc
- .Net Memory Profiler(国外英文资料).doc
- 00301.中学化学实验现象总结(国外英文资料).doc
最近下载
- 物业管理区域内房屋日常管理与维修养护方案.docx
- 新改版教科版三年级上册科学全册知识点(超全).doc
- 2030荆霄鹏《楷书入门基础教程》-结构.pdf
- 青海省1000MW风电场35kV集电线路杆塔结构施工设计图册.pdf
- 人教版音乐二年级上册《理发师》(课件).pptx
- 2023年上海市各区初三语文二模试题汇编之文言文译文汇总.docx
- 材料与诊疗项目关系对照库2013.12.27.xls
- 人教版八年级上册英语单词词性转换词形转换.docx
- IPCEIAIPCJEDECJ-STD-002E-2017元器件引子、焊、接柱和导可焊(中文版).pdf
- 普通高中学校办学水平督导评估自查报告.pdf
文档评论(0)