- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
管廊脚手架搭设方案(沙特)
HADEED DR MODULE D DEBOTTLENECKING (DBN) PROJECT
THE METHOD STATEMENT OF SCAFFOLD FOR PIPE RACK
ELECO-11071-DBN-TJ-FA-
A 2 Dec 2013 ISSUED FOR REVIEW REV DATE DESCRIPTION PREPD
(ELECO) CHKD
(ELECO) APPD
(ELECO) WISON Content
1. Introduction 3
2. Scope of Work 3
3. Manage Guidelines 3
4. Applicable Regulations and Standards 4
5. Man Power and Materials Supply 4
6. Scaffolding Material Standards 5
7. General Erection Methods 5
8. Special Erection Methods for Pipe Rack (New PR included) 7
9 Inspection 20
10 Scaffold tagging system 21
11 Modifications 21
12 Hazards 21
13 Safety Signs and Barriers 22
14 Precautions during Construction and Dismantling 22
15 Competence and Training 22
Introduction
The purpose of this document is to describe the working methodology for erection, modification and dismantling of scaffolding works in pipe rack area (new pipe rack included).
Scope of Work
In DBN project, pipes and cable trays will be placed on steel structures whose elevation is 7.1m and 9.1m respectively. The total length of all scaffolding extends to 700m or so. And the scaffolds shall meet working demand of erecting, welding, painting coating of the pipeline. Considering such situations, Tower Scaffolding, Hanging Scaffolding, and Cantilever Scaffolding are applicable.
Manage Guidelines
SCAFFOLDING CONSTRUCTION (SC) shall mandatorily:
a) Prior to commencement of any activity, all personnel involved in scaffolding works shall attend the project HSE induction.
b) The site management, supervisors and safety officers will closely monitor all plashes of scaffolding activities in connection with compliance of safe working methods, daily tool box meetings.
c) Ensure that all scaffolders are third party certified scaffolders who adhere to the recognized standard or code of practice with respect to the selection, erection and possible modifications of scaffolds.
d) Provide adequate personnel protective equipment (PPE) such as gloves, head pr
您可能关注的文档
- 等高线地形图强化训练题.doc
- 第四课 “巨人”辈出——文艺复兴美术.ppt
- 策划代理项目与纯策划项目和开发商沟通的区别-郝伟.pptx
- 答辩文档 2.ppt
- 筛分机题库11.doc
- 第四课恪守职业道德 。.ppt
- 筹备主管的职责.ppt
- 第四章 空间数据获取.ppt
- 简单的C语言编译器.doc
- 策略如何看化工.ppt
- 农作物中甲草胺、乙草胺、丁草胺残留量的测定 气相色谱法 __DB15_T 2113-2021.docx
- 中蒙跨境口岸地区生物媒介鼠疫监测、检测和防护技术规程 第3部分:人员防护 __DB15_T 2265.3—2021.docx
- DB15_T 2930-2023 黄河流域露地西瓜、甜瓜病虫草害农药减施综合防控技术规程.docx
- DB15/T 2844.3-2022边境口岸病媒生物跨境联合监测及检测技术规程 第3部分:蜱.docx
- DB14/T 2995-2024灸疗技术操作规范 中药泥灸.docx
- DB14/T 2996-2024医疗机构灸疗场所设置要求.docx
- DB14/T 2997-2024特色针法操作规程 中风利咽通窍针.docx
- DB14/T3022-2024地方习用对照药材制备通用技术要求.docx
- 2025年河北高考化学试题.doc
- 2025年河北高考政治试题.doc
文档评论(0)