- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
冷缩电缆终端接头制作安装_作业指导书
DLFJAZ-01冷缩电缆终端接头制作安装作业指导书113第8部分:配网工程冷缩电缆终端接头制作安装作业指导书编码:DLFJAZ-01目次1 适用范围························································································································································952 编写依据························································································································································953 作业流程图·····················································································································································954 安全风险辨析与预控·····································································································································955 作业准备························································································································································966 作业方法··························································································································································67 质量控制措施及检验标准·······························································································································91 适用范围1.1电压等级35kV及以下配网工程。1.2 电气类别冷缩电缆终端头安装(户外、户内)。2 编写依据表2 编写依据序号引用资料名称1GB50168—2006《电气装置安装工程电缆线路施工及验收规范》2DL/T5161.5—2002《电气装置安装工程质量检验及评定规程第5部分:电缆线路施工质量检验》3GB50217—2007《电力工程电缆设计规范》4Q/CSG11105—2008《南方电网工程施工工艺控制规范》5GB50303—2002《建筑电气工程施工质量验收规范》6《中国南方电网有限责任公司基建工程质量控制作业标准(WHS)》3 作业流程图4安全风险辨析与预控图3作业流程图4.1冷缩电缆终端接头制作安装作业前,施工项目部根据该项目作业任务、施工条件,参照《电网建设施工安全基准风险指南》(下简称《指南》)开展针对性安全风险评估工作,形成该任务的风险分析表。4.2按《指南》中与冷缩电缆终端接头制作安装作业相关联的《电网建设安全施工作业票》(编码:DLFJAZ-01-01/01),结合现场实际情况进行差异化分析,确定风险等级,现场技术员填写安全施工作业票,安全员审核,施工负责人签发。4.3施工负责人核对风险控制措施,并在日站班会上对全体作业人员进行安全交底,接受交底的作业人员负责将安全措施落实到各作业任务和步骤中。4.4安全施工作业票由施工负责人现场持有,工作内容、地点不变时可连续使用10天,超过10天须重新办理作业票,在工作完成后上交项目部保存备查。表4.1 作业任务安全基准风险指南序号危害名称风险种类风险等级风险控制措施1施工区域没有安全围蔽摔绊扭伤坠落打击中等风险路边敷设电缆,施工区域必须做好安全围蔽及警示标志措施,晚上设置夜间警示灯,防止外人误入工作区域2施工区域防暑降温措施不足中暑中等风险1. 避开炎热时间段作业;2. 配置太阳伞,配置风扇;3. 及时补充水分;4. 现场配备应急药品3高处作业没有使用安全带坠落中等风险
文档评论(0)