- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
门路勘测设计试题01(国外英文资料)
道路勘测设计试题01(国外英文资料) Road survey design questions One, single item choice (1.5 points, 27 points total) The four-lane highway can generally be used to accommodate the average length of day of the year in which cars are converted into small buses. A. 65000 ~ 90000 B. 60000 ~ 100000 C. 60000-80000 D. 25000-55000 The minimum length of the vertical curve is calculated by the speed of the car at the speed of the design. T is (C). A. 6 seconds B. 0.5 seconds C. three seconds, D. 1 second Set A loop between the line and the radius of radius R. The length is L, the parameter is A, R, L, and A unit are all m, and the correct formula for the formula is (C). A.R - L = A B.R + L = A C.R, L = A2 D.R 2 / L = A The radius of the vertical curve and the outer distance are R and E respectively, each of which is m, and the slope Angle omega is the relation of R and E to (B). The maximum width of a lane is (D). A. 3.5 m B. 3 m 4 m C. D. 3.75 m The JD pile is K1 + 300, and the basic flat curve, which is the length of the tangent line, is 150.5 m, and the point number is (ZH). A.K 1 + 350.5 B.K 1 + 149.5 C.K 1 + 450.5 D.K 1 + 249.5 The road base design of new two, three and four highways is adopted (). A. the line is high in the middle of the lane, high in high and wide, and high in the middle line B. The line in the middle of the line is high, and it is high and wide in the high and wide area C. The edge of the roadbed is high, in setting high and wide area to set high, widen front elevation D. The edge of the roadbed is high, and high and wide area is set high in high and wide area The first step in the selection process is (). A. take A line, longitudinal, and cross design B. step by step plan for local route C. identify all the points of control D. the basic direction of the solution The correct way to put a real slope in the field line is (). A: true slope means the largest longitudinal A true slope is an average grade The slope of the specified line is basically the design grade of
您可能关注的文档
最近下载
- 神经系统的个体发生神经解剖学讲稿.pptx VIP
- 中国现代作曲家:三宝人物简介PPT课件.pptx VIP
- 社会责任审核注意事项课件.pptx VIP
- 艾默生涡旋压缩机产品手册.pdf VIP
- 四川成都财务审计师CFA培训认证简章.doc VIP
- 第七单元 第01课时 条形统计图(一)(学习任务单) 四年级数学上册人教版.docx VIP
- 《当幸福来敲门》ppt课件.pptx VIP
- 社会责任审核培训课件.ppt VIP
- 2023年海南三亚市崖州区机关事业单位招考政府雇员储备库100人笔试参考题库(共500题)答案详解版.docx VIP
- 《房颤诊断和治疗中国指南(2023)》解读PPT课件.pptx VIP
有哪些信誉好的足球投注网站
文档评论(0)