- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
门路纵断面设计(国外英文资料)
路线纵断面设计(国外英文资料) Liumr Route profile design 1, the assumptions The area is hilly terrain, and the surface is mainly covered with grass vegetation; The vegetation is covered with a loose accumulation of the fourth line, which is based on gray, gray, silvery, and mudstone. The thickness is between 6.6 and 31 meters. 1.3 this area belongs to the natural areas Ⅰ class divided, namely continental subfrigid zone climate, rainfall mainly concentrated in 7, 8, 9 months. The critical height of the wet state during the rainy season is 84cm, and the critical height of the wet condition in April and may is 56cm. 2, the design requirements 2.1 according to the results of the flat line, the longitudinal profile of the two broken chains is designed with the given conditions. 2.2 according to the design starting point of the ground flat curve and the longitudinal section of the midpoint, select the material and explain the reason. The 22.3 drawing scale is 1:10, the x-coordinate is 1:50, and it is drawn with A3 paper. 2.4 specification design format, design procedure, design content; 2.5 required materials: first assignment A3 paper Notes, reference books (dew-mining line engineering, zhang daxian). The principle of vertical section design Profile design should obey the superior on the basis of 3.1 (total gauge, gauge, feasibility study, early operation such as approved in elevation), depending on the stage of the work to achieve reliable routing basis; To meet the technical standards of the design of the section, meet the level requirements; Equilibrium; The lowest of the roadbed was 84cm. To guarantee the embedding and use of municipal pipelines. The minimum thickness of the coating is 0.7 m. Sometimes drains control the road height. 4, design steps 4.1 preparation The road map is marked with the milepost and the 100-meter mark and its elevation. The total length of the design is 1575.2 m, which spans 3.27 m. Were set up 15 meters pile, 27 miles, including K0 K1, K2 K4 K6 K7 K8 k
有哪些信誉好的足球投注网站
文档评论(0)