- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
路基干湿类型对路基有何影响(国外英文资料)
路基干湿类型对路基有何影响(国外英文资料) The packing particle size must not be greater than 15cm. The method of filling the rock and foundation is vertical, the method of lamination, the impact compaction and the strong compaction. The vertical filling method (pour filling method) is mainly used for secondary and secondary and laying low pavement under the highway in the steep slope construction particularly difficult or fill sections on lots of blasting to dig, and unable to struggle up the steep slope of the embankment of bottom-up hierarchical operation, broken rock, mud and water rock fill embankment. The method of construction of the method is more stable and stable. The layered compaction method (roller compacting method) is widely adopted and can guarantee the quality of the stone embankment, and the method is layered and compacted at the bottom level. This method is used for highway, first class highway and other grade road embankments on the advanced road surface. The stone embankment is divided into four stages, four working sections and eight process processes. Regarding the filling embankment, the technological process is: the construction preparation, packing for shipment, layered filling, laying flat, vibration rolling, detection sign recognition, forming, roadbed subgrade repair. This paper briefly describes the method of excavation of soil by bulldozers. The bulldozers excavate the soil for a cycle by cutting soil, transporting earth, unearth, regress (or return-back), and empty back. The main factors that affect the efficiency of the operation are the soil and the soil. Therefore, it must be covered with the minimum amount of time and distance, and as much as possible to minimize the loss of soil during the push. Bulldozers, digging soil cutting operation method and the method of filling subgrade the same is downhill bulldozing, slotted bulldozing, tied for bulldozing, relay bulldozing the wave bulldozing method. There is also inclined shoveling soil method and side
有哪些信誉好的足球投注网站
文档评论(0)