- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
超长任务面可行性论证(国外英文资料)
超长工作面可行性论证(国外英文资料) The feasibility of a long working face The significance of the feasibility study of 1.1 working face Comprehensive mechanized coal mining working face length, average of 150 ~ 220 m, such as mining working face length for licensing the technology conditions of up to 250 ~ 300 m, each working face length consistent as much as possible. The length of ordinary mechanized coal mining is usually 120 ~ 160m, and the total length of the working face is 200 ~ 300m. The length of the working face is 80 ~ 150m. When tectonic influences such as fault are affected, the length is determined according to the actual situation. The working face of the slanted coal seam using the pseudo-slanted flexible shield is usually 30 ~ 60m. Overlong working face refers to the working face of more than 300m working face, with the following advantages: (1) in the process of recovery, it is possible to find the suitable working face length to ensure the safety factor of the coal mining. Extending the distance of working face in a certain scope can realize the high productivity and efficiency of the work surface, and reduce the purpose of consumption. (2) the length of the working face is the most effective. It is the study of coal mining technology. In suitable conditions, increase the length of working face, can not only improve the yield, convenient roadway layout, simplify the production system, is advantageous to the mine production is highly concentrated, and can improve the mine resource recovery rate, and is conducive to the surface buildings (such as railway, highway, etc.). (3) in perfect working face equipment and improve the level of mining equipment, on the basis of extended length of working face, raise the yield of full-mechanized caving mining face, to promote the development of the mine production is highly concentrated, accelerate the construction of high production and efficiency mine, this is the direction of further development of full-mechanized caving mi
您可能关注的文档
最近下载
- 广州数控GSK980TB3系列使用手册.pdf
- (热门!)必威体育精装版版的比亚迪供应商审核自查表(可编辑!).docx VIP
- QJ300-12N钱江闪300维修手册(24.7.16).pdf VIP
- 一消《消防安全案例分析》历年真题及答案解析(第2套).pdf VIP
- (完整word版)内科护理学第五版目录.pptx
- 3.1 中国的土地资源(教学课件)地理商务星球版2025八年级上册.pptx
- 动力电池产品介绍.pptx VIP
- 肺结核患者的护理常规.pptx VIP
- 必威体育精装版国家开放大学国开电大《机械制图》形考任务1-4 参考答案.pdf VIP
- 中国新能源汽车动力电池产业现状及前景展望.pptx VIP
有哪些信誉好的足球投注网站
文档评论(0)