- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
足手架搭接标准(国外英文资料)
脚手架搭接规范(国外英文资料) One total To 1.0.1 in pile foundation design and construction to carry out national technical and economic policy, do apply, advanced technology, reasonable economy, safety to ensure the quality, protect the environment, make this specification. The 1.0.2 specification applies to the design, construction and acceptance of the pile foundation of all kinds of buildings, including structures. 1.0.3 pile foundation design and construction, the engineering geological and hydrogeological conditions be taken into account, the upper structure type and use function conditions, load characteristics, construction technology and the environment; We should pay more attention to the local experience, adjust the local conditions, pay attention to the design of the concept, choose the pile type, pile process and the form of the pile, optimize the pile and save the resources. Strengthen construction quality control and management. Material requirements: The steel tube wall thickness must be calculated by sigma = 3.0 mm, considering that the wall thickness of the market steel pipe is negative deviation. The pre-set material needs to be carefully selected, the steel tube, the buckle should be qualified, and the new steel pipe should have the factory certificate. Quality inspection should be carried out before the use of the old steel pipe and the fastener, and all the pipes shall not be used for bending, cracking, distortion or damage and size. The pipe should be painted. 1.2 fasteners: use of malleable casting, no crack, porosity, shrinkage, sand eye etc. It is found that there is a crack, deformation, and the bolt must be replaced. 1.3 safety net: the safety net USES the high density polyethylene network, the density of the network is 2000 eyes / 100 square centimeters. Hung inside from step 1 above, and the safety net fixed outside the scaffold in the stud side, fastened with nylon and longitudinal stick, hanging safety net requirements closely, flat and level. Set
您可能关注的文档
最近下载
- 奋达供应商质量体系审核表B1版本+自评模板 (格式可转换)OK.pdf
- 水星船外机二冲程15-25-30 HP E-ETC 2012 英文维修手册.pdf
- 水星船外机二冲程 200-225-250-300 HP 90° V6 2010 英文维修手册.pdf
- 第三章_期权交易结算.pdf VIP
- 十五五规划纲要解读:高端装备制造领跑.pptx
- 微信聊天记录想要恢复原来如此简单!一学就会.pdf VIP
- 《总裁沟通及影响力》--杨台轩详解.ppt VIP
- 必威体育精装版人教版九年级上册数学期中试题(含答案).docx VIP
- 西门子智能照明办公大楼应用.pdf VIP
- 智能照明系统(西门子InstabusKNXEIB系统)专项施工方案.doc VIP
有哪些信誉好的足球投注网站
文档评论(0)