- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
观赏南京城北水厂(国外英文资料)
参观南京城北水厂(国外英文资料) Visit the north water factory in nanjing In early July, we went to visit the north water plant in nanjing to learn about the process of water treatment. The water plant is composed of two spread a diameter of 2400 in the tunnel of underground pipes from primary pump room will be muddy water from the river to the water treatment works, the total length of 700 meters, second only to xuanwu tunnel, tunnel is north of the source water. The first phase of the water plant in chengbei water supply is 500,000 tons per day, and the water supply is 250,000 tons. The construction was built in April, 1997, and the construction was completed in August 2000. That compared with the north river water, higher degree of automation, the source water of 23.5 mu, none of T area, the water treatment works fully controlled by computer, testing probe, the microcomputer system of central control room monitoring source waterworks work 24 hours a day. And north water pump unit also introduces the high voltage variable frequency speed regulating device, high speed frequency, low energy consumption, energy saving of eighteen percent, can also save electricity for the whole year is about 2.5 million yuan. After the construction of the water diversion project and the water pipeline, the land has been restored and greening. Engineering USES the tubular static mixer, flocculation with hydraulic, vertical flow folded-plate flocculating process, precipitation by advection sedimentation tank, v-shaped filter and supporting facilities such as water, but not construction production wastewater sludge concentrating and dewatering device, sewage and rainwater discharged into municipal network, also the main noise source acoustic noise reduction measures were taken. Campus green area of 8800 square meters, accounting for sixty-five percent of the total area, formulated the chlorine gas leakage risk accident emergency plan, set up a sudden pollution accident emergency response measures, the
您可能关注的文档
最近下载
- 房地产估价规范.docx VIP
- 锅炉与锅炉房设备施工链条炉排的安装4.8.1链条炉排的安装.pptx VIP
- 石油石化系统治安反恐防范要求.pdf VIP
- 一种基于光热协同固化的金属墨水及其增材制造的方法.pdf VIP
- 锅炉与锅炉房设备施工往复炉排安装4.8.2往复炉排安装.pptx VIP
- 1.THK样本资料-LM滚动导轨.pdf VIP
- 重大社2024《财务实训教程—智能财务共享》教学课件-财务共享服务中心运营管理.pptx VIP
- 手机摄影《手机摄影培训》课件.pptx VIP
- (高清版)DB31∕T 1589-2025 绿色食品 水产饲料生产管理规范.pdf VIP
- 博世力士乐IndraDrive驱动器中文报警手册.pptx VIP
有哪些信誉好的足球投注网站
文档评论(0)