行政办公楼施工进度计横道图(国外英文资料).docVIP

行政办公楼施工进度计横道图(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
行政办公楼施工进度计横道图(国外英文资料)

行政办公楼施工进度计横道图(国外英文资料) Serial number Construction schedule The construction process On September On October In November, On December In January On February march April On may June In July In August 10 20 30 10 20 31 10 20 30 10 20 31 10 20 31 10 20 29 10 20 31 10 20 30 10 20 31 10 20 30 10 20 31 10 20 31 one Basic division 2 A layer of the main body 3 The main body on the second floor 4 Three layers of the body 5 Four main body 6 Five layers subject 7 Six main body 8 Seven layers of the body In the spring section 9 roof 10 A layer of brick masonry 11 Two-story brick masonry 12 Three layers of brick masonry 13 Four layers of brick masonry 14 Five-story brick masonry 15 Six-story brick masonry 16 Seven layers of brick masonry 17 A layer of hydropower is buried 18 Second layer hydropower preburial 19 Three layers of hydropower are buried 20 Four levels of hydropower are buried 21 Five layers of hydropower are buried 22 Six layers of hydropower are buried 23 Seven layers of hydropower are buried 24 East wall painting and decoration 25 The exterior wall is painted and decorated 26 West exterior wall painting and decoration 27 The north wall is painted and decorated 28 A layer of plumbing installation 29 Second layer plumbing installation 30 Three layers of plumbing installation 31 Four layers of plumbing installation32 Five layers of plumbing installation 33 Six layers of plumbing installation 34 Seven layers of plumbing installation 35 A cable installation 36 The second layer cables are installed 37 Three layer cables are installed The construction schedule of the administrative office building 38 Four layer cables are installed 39 Five layer cables are installed 40 The six layer cables are installed 41 The seven layer cables are installed 42 A layer of interior wall painting 43 The interior wall of the second floor is painted 44 Three layers of interior wall paint In the spring section 45 Four layers of interior wall paint 46 Five layers of interior wall painting 47 Si

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档