结构柱确认(技巧)洽谈单(国外英文资料).docVIP

结构柱确认(技巧)洽谈单(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
结构柱确认(技巧)洽谈单(国外英文资料)

构造柱确认(技术)洽商单(国外英文资料) Technical change (business) record No. : Chongqing built junjun - 8 - engineering The name of the Win-win. Hotel (five-star) project Drawing number JianShi figure engineering Parts of the Construction of construction partition wall construction Change reason, change content and sketch: The structure of the column is arranged according to the chart number c-09 and the a-15, b-15 and the structure column. The entrance of the doors and Windows is based on southwest 03G301 (1) 22 pages, 23 pages, 24 pages. The present watering belt practice, southwest 05G701 (4), pp. 26-30. The unit (official seal) : Date of the year Technical leader: years month day The results: Supervisory unit review opinion: Chief supervising engineer: (official seal) years month day Construction unit review opinion: Technical leader: (official seal) years month day Design unit nuclear agreement: Pro: Project leader: (official seal) years month day Construction of beams and beams: (a-15, b-15, c-09) The seismic construction measures of the filling wall of the hollow brick wall of this project are based on the adoption of the southwest 05G701 (4). The seismic intensity is 6 degrees. The interlining of the inner wall and the turning point of the outside wall should be set up with the composition column, and the spacing of the column shall not be greater than 2 times the wall. At the end of the column, the outer wall is not bigger than 1m and should be set in the end of the concrete frame. To fill the wall with holes, the width of the hole is greater than 1.5, and the concrete border should be set on both sides of the hole. When the opening width is greater than 2.1 m, the structure column should be set on either side of the hole. The filling wall and the structure of the conformable column are detailed in the 30th page of the southwest 05G701 (4). The hollow brick wall should be drawn with the frame column, the structure pillar and the concrete frame of the concrete frame, which

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档