- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
箱梁浇筑次序图(国外英文资料)
箱梁浇筑顺序图(国外英文资料) The concrete enters and vibrates 4.3.1 after the inspection of the steel bar and the template, the concrete is poured, the concrete is mixed, and the truck is carried to the cast-in-place. The entry mode of concrete is as follows: Floor: the concrete is carried by a portable vibrator in the interstitial space between the inner and outer membrane. Abdominal plate: the concrete is placed in the interstitial space between the inner and outer membrane. Roof: directly cast on the top plate 4.3.2 precast box girder concrete pouring from one end of the beam to the other end of the oblique layered each layer according to 30 cm casting, for casting to reverse casting when 1/4 span length, and closed the 1/4 span. The casting sequence is poured into the board and the roof concrete. The concrete of the bottom plate is laid in parallel, and the concrete of the concrete after the concrete of the bottom plate is fully vibrated, and the concrete of the roof is cast. The thickness of each layer is no more than 30cm. The concrete casting sequence is shown below Concrete casting profile Concrete casting facade 4.3.3 concrete vibrates The concrete vibrates in the way of artificial vibratory and mechanical vibratory. The insert vibrator is not allowed to vibrate steel beam anchor plate, not to be able to impact the steel reinforcement and vibration of the steel bar, etc. The steel beam is close to the template and the reinforced area of the anchor plate, which is to be used with the method of vibration. The ground plate is vibrating with vibratory rods, and then the sealing plate and the top of the back plate are sealed after the concrete is sealed. Web use 30 mm immersion vibrator, adherent vibrator support ascending bubbles way layered vibrating, layered thickness is less than 30 cm, attached type vibrator vibrating time control between 10 ~ 15 seconds, and shock vibration intensity is weak earthquake ~, adherent vibrator may not open strong earthquake. When the abdo
文档评论(0)