- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
粉煤灰加气混凝土砌块墙体裂缝构成启事及防裂做法(国外英文资料)
粉煤灰加气混凝土砌块墙体裂缝形成原因及防裂做法(国外英文资料) The water content of masonry should be less than 15% and dry. The moisture content should be watered at 1-2d in advance while controlling the moisture content. During the high temperature season, it is advisable to water the masonry. ???? (4) the cutting block should be used with a hand-held machine or corresponding mechanical equipment. ???? (5) before masonry, the Central Line, the border line and the doors and Windows of the wall of the popup should be pressed to the position of the wall of the wall, and the line shall be drawn as the mark of the leather number pole. The well is designed to be masonry. And properly control the building speed of each day. ???? (6) fill the bottom of the wall of the wall with high strength bricks, such as gray-sand bricks, page tiles, concrete bricks, etc. The height should not be less than 200mm. ???? (7) bricks of different dry density and strength grade shall not be mixed up, and shall not be mixed with other bricks or bricks. ???? (8) the corners of the masonry and the transition shall be built simultaneously. To be unable to build and build at the same time, the temporary discontinuities should be set up. ???? (9) the position of the bar that fills the wall of the wall is in accordance with the number of blocks. Its steel reinforcement method is used in the frame column. The specification, quantity, spacing and length should meet the design requirement. Fill the gap between the filling wall and the frame column. ???? When masonry masonry, the level of water level and flatness shall be strictly controlled. The seam should not be less than one third of the length of the block. It should not be more than 2 PI. ???? (11) of the masonry mortar joint thickness and width should be correct, the horizontal mortar joint thickness and width of the vertical mortar joint should be 15 mm and 20 mm respectively, the horizontal and vertical mortar plumpness of masonry shall be 80% or higher at the same time af
文档评论(0)