- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
空中混凝土垫层施工工艺(国外英文资料)
地面混凝土垫层施工工艺(国外英文资料) Floor concrete bedding construction technology This process is applicable to the construction of concrete pad layer on the ground of industrial and civil construction. Materials and main tools: Cement: the cement, Portland cement, Portland cement and Portland cement. 2.1.2 sand: medium sand or coarse sand, not more than 5%. Pebbles or gravel. The size of the particle size is 0.5 ~ 3.2 mm and the amount of mud is not greater than 2%. 2.1.4 concrete mixer, the scale, carts, or skip, sharp spade, shovel, chute barrel or plate vibrator, string, scraping bars, wood trowel, rubber hoses, iron chisel, steel wire brush. 2.2 operating conditions: The quality of the main structure of the main structure has been completed, the door frame is finished, and the level of 50cm has been bounced around the wall. 2.2.2 through the heating of the floor and the pipeline has been installed, the pipe holes have been made of fine concrete and have been filled in. The horizontal electric tube laid in the cushion layer is finished, and the procedure is completed. 2.2.4 before the first concrete cushion on the ground, through the indoor heating ditch and gully inside heating pipe has finished, finished the completed acceptance procedures and drainage pipe, indoor backfill soil component quality inspection evaluation. 3.1 process flow: The base processing, the high level, the horizontal control line, the concrete stirring, the concrete and the vibrating leveling 3.1.1 basic level processing: the binding on the concrete base laitance, loose concrete, mortar, etc with a chisel shave, use wire brush to brush off the slurry skin, and then use the broom. 3.1.2 to find the level control line: according to the level of the + 50cm level on the wall, the height of the padded layer is measured, and the condition can be played on the surrounding wall when conditions are available. 3.1.3 concrete stirring 3.1.3.1 according to the mixture ratio (its strength grade is lower than C10 str
您可能关注的文档
最近下载
- 人工挖孔桩工程量计算格式表格.xls VIP
- 北京师范大学天津静海实验学校2024-2025学年高二上学期第一次月考化学试卷.docx VIP
- 室内装饰装修施工组织设计.pdf VIP
- 人教A版(2019)必修第一册2.3二次函数与一元二次方程、不等式 同步练习(Word版含解析).docx VIP
- 5000tpd燃烧器技术介绍.pdf VIP
- 2023年山西云时代技术有限公司校园招聘考试笔试题库及答案解析.docx VIP
- 小学低年级传统文化故事教学策略研究与实践教学研究课题报告.docx
- 第4课 运动负荷的监控+课件+ 2025-2026学年人教版(2024)初中体育与健康八年级全一册.pptx VIP
- 中级职称评审-人工智能工程-专业技术报告.docx VIP
- 食品生物技术概论 教学课件 作者 廖威 主编 谭强 主审 第二章 基因工程在食品工业中的应用.ppt VIP
文档评论(0)