- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈挡土墙的外观操纵(国外英文资料)
浅谈挡土墙的外观控制(国外英文资料) Talk about the line control of the retaining wall Zheng Li wu Abstract: over the years, Yang, exterior oblique earth-retaining wall always has some flaws, including the construction technology and construction measure are played a key role, how to control, in this paper, the back inclined type retaining wall the appearance of the problem in the construction process of some views for the individual. Keywords: high road elevation retaining wall appearance control 1. Introduction With the development of highway construction in China, especially the rapid development of high-grade highway. Retaining wall is widely used in highway construction of a retaining protective structures, especially the oblique type retaining wall, has become the dominant region of guizhou highway retaining protection. Because, the subgrade slope excavation retaining wall, wall of upward inclined type retaining wall back easily combined with excavation slope, can reduce the quantities of the conditions, protect the stability of the slope; To fill project, under the condition of terrain, terrain and construction permit, elevated diagonal type back earth pressure of retaining wall is small, to obtain more economic wall body section, at the same time also can shorten the construction period. Engineering overview Travelling with three standard in guizhou qiannan changshun, the period of this contract is located in the karst landforms, across the 9.347 km long, high fill embankment dig section is more, the total amount of excavation is 1658761 m? The total amount is 1989122m? . There are ten block walls in the line and 477.95 m in total, both of which are leaning against the earth wall. Causes and hazards of cosmetic defects With the development of the project, the appearance is not the whole of upward inclined type retaining wall, concrete surface voids, pits and matt surface, linear bad, wrong, offset, the cross section vertical to a sequence of ills such as folding line gradual
您可能关注的文档
最近下载
- 2024年浙江省镇海中学自主招生数学试卷及答案 .pdf VIP
- 自治区取暖费补贴文件2010.pdf VIP
- 500kV变电站运维精益化管理探究(电力系统及自动化论文资料).doc VIP
- 第一单元--观察物体(单元测试)-2025-2026学年三年级上册数学人教版.docx VIP
- (入党志愿书空白表格.doc VIP
- 第一单元-观察物体(单元测试)-2025-2026学年三年级上册数学人教版.docx VIP
- 企业级数据湖建设项目解决方案.pptx VIP
- 2025年新能源微电网稳定性分析与智能电网技术发展动态报告.docx
- DLT616-2006 火力发电厂汽水管道与支吊架维护调整导则.pdf VIP
- 春秋酒店改造装修项目投标文件技术部分.doc VIP
文档评论(0)