- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
正线声樊篱施工技巧交底(国外英文资料)
正线声屏障施工技术交底(国外英文资料) This is a record Construction unit: code number: Project name: The mudanjiang bridge Central mileage: GDK157 + 758.12 Site: acoustic barrier construction incapacitance Sound barrier construction technology is in the background Bottom department: engineering department Date of date: Technical leader: The person who pays the floor: Nuclear complex: Receiving department: leading, working class To receive: Note: this technology is in duplicate, the engineering department and the recipient each. Sound barrier construction technology is in the background 1 project summary I have a frantic jumble division mudanjiang super major bridge construction, railway construction mileage for GDK156 ~ GDK159 + 165.96 + 404.28), completed a total of 16 # # pier on the right side, 45 # 39-55 # pier on the left side of the two place need to install sound barrier. Because the construction of the bridge has been wrong in the early adoption of the bridge annex structure, the result has been the basic conflict between the foundation and sound barrier of some Bridges. 2 sound barrier construction preparation The equipment is ready Torque wrench, mortar mixer, homemade mobile platform construction, the 25 t crane, wheel excavator, small flat car, steel tape, spirit level, with a magnet wire hammer (can use existing strings tuned rail box modified), steel brush, round die, bolt spacing test mould, electronic scale, small impact drill, hammer, sprayer, safety measures. 2.2 site preparation The sound barrier is fully inspected and completed, and the pre-buried parts are completed. A specific sound barrier panel plan is proposed based on the site size. Construction process flow The cleaning and refurbishing of the pre-buried parts, the installation of the vertical column, the installation of gravity mortar injection and the installation of aluminum alloy plate, and the integrated ground construction. Construction operation and attention matters To clean and repair the pre-buri
您可能关注的文档
最近下载
- 2024年新教科版八年级上册物理全册教案.docx
- 《产品项目设计》课件(全).pptx VIP
- 病理科(中心)建设与配置标准.pdf VIP
- T∕CSPSTC 54-2020 -岩石隧道掘进机法技术规程.pdf VIP
- 情绪调色盘初中心理健康教育通用版.ppt VIP
- 外研版英语九上Module5 Museums 单元整体教学设计.pdf VIP
- 初级会计职称经济法基础第四章个人所得税.pptx VIP
- 2025-2030中国量子级联激光器行业市场发展趋势与前景展望战略研究报告.docx
- 中国大地财产保险股份有限公司工程机械设备保险条款.PDF VIP
- 台州市中等职业学校新设专业申报表---)-无人机 .pdf VIP
文档评论(0)