- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
日常任务(国外英文资料)
日常工作(国外英文资料)Daily work points of the project supervisor departmentFirst, the supervisory work prior to the start of the project (organized by the project director)Compile supervision plan(1) the landlord shall hold the first meeting of the site and conduct the supervision.(2), the organization drawings will be tried and designed.(3) to assist the owner in the transfer of horizontal and altitude control points.(4) to review the design or construction plan of the construction organization.(5) to sign the report on the construction of the project.The information submitted by the construction unit (responsible for the information supervision engineer) :Certificate of qualification of construction permit and construction unit.(2), the design of the construction organization or the construction plan (including the total plan of the total plan of the construction plan).(3) the certificate of qualifications of environmental health service (certificate) of the transport unit of the remaining mud and refuse.(4) and night construction permits.(5) the quality architecture, the management personnel and the special operators certificate.(6) construction equipment and inspection reports.(7) construction report.(8) the concrete permit shall be stirred at the site.(9) other relevant information.3, collect the information of the owners unit (responsible for the information supervision engineer) :(1) construction contract.(2) fire protection report.(3).(4) the termites should be built.(5) the sanitation of the sanitation (including the drainage of the class and the discharge of polluted water). ,(6) the prevention and construction of lightning.(7) the development of water and electricity.(8) and residual clay residue certificates.(9), quality and safety supervision procedures.(10) other relevant information.The supervision of construction phase:1, the red line of the root diggings bureau, the location axis and the high mark (the responsibility of the measuring supervision engineer) re
文档评论(0)