- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程决算注意事项(国外英文资料)
工程决算注意事项(国外英文资料)
Matters concerning project determination
? Engineering verification. The engineering quantity is the basic basis of the final calculation, but to accurately calculate and verify the engineering quantity of each branch, the first must be familiar with the construction drawing.
?? The actual situation of the construction site must be clear. In construction process, often can have some influence project final accounts, such as the change of geological data, the environment of the obstacle, the construction way of changing, drawing in the design of error and error correction, and party a proposed change, etc. As a construction unit, it is usually the time to drill down to the site, master the actual construction and do the visa work. To make the correct adjustment according to the relevant provisions of the contract in case of the change project and the knowledge of the project.
?? In the final audit, the work content of each part of the budget quota must be familiar, in case the calculation is repeated. As in earthwork, mechanical digging earthwork project, including the bulldozers earth-moving, some units at closing, are often applied mechanical digging earthwork calculation again, calculate the bulldozers earth-moving again, such phenomenon in the final examination, to seek truth from facts to get rid of double-counting.
?? There are a number of computational rules that must be understood in all parts of the budget quota, such as flat ground, trench geosyncline and foundation pit. What is the calculation of single row scaffolding, double row scaffolding and manchu scaffolding, and which projects do not calculate the cost of scaffolding? The steel bar loss, the hook, the lap, etc. There are also some rules to deduct from the rules of calculation, such as those that should be deducted from the wall. At the same time, there are some rules that should be added to the quota. Like these items, party b in the preparation of final accounts, often neglect, s
您可能关注的文档
最近下载
- 安徽省芜湖市区2024-2025学年七年级下学期期末考试英语试卷(含答案,无听力).pdf VIP
- 2025 党校入党积极分子预备党员考试题库(含答案).docx VIP
- (高清版)-B-T 30146-2023 安全与韧性 业务连续性管理体系 要求.pdf VIP
- 猫病诊疗技术—猫静脉留置针放置技术.pptx VIP
- 保温装饰一体板施工技术交底.docx VIP
- 征信报告模板2025年新版可编辑带水印.pdf
- 2.3一次式 同步练习(4课时)2024-2025学年六年级上册数学沪教版(五四制).docx VIP
- 2025年建筑内部装修设计防火规范.doc
- 2022年中国人民解放军南部战区总医院医护人员招聘题库及答案解析.docx VIP
- 沪教版新教材初中数学2.3(3)一次式的加减.pptx VIP
文档评论(0)