屋面檩条装配(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
屋面檩条装配(国外英文资料)

屋面檩条安装(国外英文资料)The roof lines are installedPurline installation:Leveling: before the installation, the purline of the purline is tested and levelled, and the purline of the purline shall be reviewed at the same time, and the high difference between the two lines of the purline shall be within the range of plus or minus 5mm.Play line: purlin bearing point should be fixed in accordance with the design requirements of the position of supporting points, application of supporting points for this line, the purlin installation location, according to the purlin acceptance plan.Fixed: the welding or bolting is fixed by design, the position is adjusted again before fixing, the deviation is less than or equal to 5mm.Acceptance: after the installation of the purline, the project technical person shall notify the quality officer or the supervising engineer to check the acceptance, confirm the qualification and transfer to the next procedure.Colour plate laid and fixedThe sequence of colored steel plates is laid in principle by the upper and lower end of the wind.(1) a, the first row of the first fixed roof, with self-tapping screws in purlin the left, then the purlin play chalk line do datum line, and then fixed with fixed bridge. B, the first board of the ribs on the floor of block, press card into the fit check whether correct, laying face to tapping screw thread, along the center of each rib plate fixed on the article yan. After the first plate has been settled, it will be installed on the edge of the board, and every time it is installed, it will be inspected without deviation. Will be fixed on a short arm buckle has laid the first panel of the Yin, according to the method of construction, with gable side do starting point, from left to right (or with right and left) in accordance with the order laid, and adjust the level. D, in the above order, the last remaining space is less than half of the width of the board, and the rest of the space is covered with a pan. E, if the rem

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档