刚架拱施工组织设计(国外英文资料).doc

刚架拱施工组织设计(国外英文资料).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
刚架拱施工组织设计(国外英文资料)

刚架拱施工组织设计(国外英文资料) Rigid frame arch construction The XXE04 contract segment K107 + 620 pedestrian bridge is designed to be 1-62.88 m rigid arch bridge, the design adopts the prefabricated component to have the construction method of the stent installation. After the construction approach, the site should be cleared in time and the precast yard shall be prepared. The prefabricated field is arranged on the outside of the main road base, where the arch leg, the diagonal brace and the string are the general precast member, the actual abdominal segment is divided into two sections, all using the horizontal prefabrication. The pre-fabricated parts are used in the vault of the arch and the arch legs, the string and the arch of the arch, and the rest are reinforced with concrete joints. The foundation of the newly built arch bridge is to expand the base, use hydraulic excavator to excavate, in approach the base design elevation of 30cm, adopt artificial clear bottom, until the design is high. After basal cleared, please supervision engineer for on-site inspection, test and the bearing capacity of the basement, after qualified, timely support model, pouring concrete. After the base concrete has reached the design strength, the construction platform of the construction of the form is attached. Abutment adopts high voltage made from bamboo veneer block model, the use of steel with the supporting system of reinforcement model, at the same time in the 60 x 80 cm interval of horizontal bars, horizontal tie use Φ 20 round steel production, installation outside the pull rod set Φ 22 mm PVC plastic pipe, plastic pipe should be better than to be pouring concrete thickness of 1 ~ 2 mm long, end use sand paper to grind. Set delta = 20mm thick steel plate. The pull rod USES double nut lock to tighten, prevent pull pole to appear to be able to take off the cap phenomenon, cause run model accident. Abutment strength of concrete pouring and curing to design, and then begin to fill after wo

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档