分层开挖法(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
分层开挖法(国外英文资料)

分层开挖法(国外英文资料) Stratified excavation method This is one of the most widely used methods, which is to cut and dig from the top of the bank. The main advantage is construction is simple, use general machine equipment can undertake construction. For blasting rock size, reduce the vibration of the neutral-point earthing, are easier to control, construction technology is relatively simple, riverbank protection and reinforcement combined bolting and shotcrete (for example, etc.) are easy to make. If bank slope excavation, the slope is steep, building roads is not economic or impossible, usable shaft slag or pushing stone slag on bank slope foot, the road leads to the excavation working face is the most simple way. A slag method of the road. When the excavation of the bank is large, the construction of this method can meet the requirements of high intensity excavation. The thickness of excavated layer is determined by the performance of geology, topography and mechanical equipment. If the slope is steep, the main road (that is, the working platform) can be arranged every 40M. The upper blast slag dump the work platform or the bulldozer to the working platform for secondary transport. If the slope of the bank is steep, the construction of the road will be large, and the construction tunnel will be connected to the work surface. The surface of shore-slope is formed by means of pre-splitting blasting or blasting. 2? A slag method is in the shaft. When the slope is too steep to build the road, and the shipping, overwood or other reason is not allowed to push the slag into the river bed before the intercepting flow, the slag method can be used. Figure 7-9 shows a slag map of the shaft of the Italian yanmiyay dam. Engineering construction in front of the river closure ballasts are not allowed to be thrown into the river, and bank slope is very steep cannot build roads, bank slope excavation height of 135 M, the right bank excavated volume for 44000 ` ` M ^ 3, the left bank of 18

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档