丙烯酸球场基面处理方法(国外英文资料).docVIP

丙烯酸球场基面处理方法(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
丙烯酸球场基面处理方法(国外英文资料)

丙烯酸球场基面处理方法(国外英文资料) Acrylic ground processing method Mr Tong crown For stadium like acrylic coatings, basic processing is very important, quality of acrylic base level of the pitch a lot may affect acrylic stadium construction and later use, so you need to staff very seriously. First, lets look at the basic requirements of the acrylic pitch: 1, cement concrete foundation, label is not lower than C25, not less than 150 mm, the thickness of concrete infrastructure must have moistureproof layer, around must have a drainage ditch, concrete surface finishing, ordinary texture level best, according to the different of the site, and casting concrete or reinforced concrete, should be in the proper position of cutting expansion joints. After the cement concrete foundation is finished, after 28 days, the acrylic material will be constructed after the water treatment. 2, asphalt concrete foundation were strongly recommended, general advice shop pressure hot mix asphalt concrete, thickness of not less than 70 mm, 40 mm thick coarse asphalt concrete, 30 mm thick thin asphalt concrete, must have a drainage ditch, around without cutting expansion joints. After completion of asphalt concrete foundation, it must be maintained for 28 days, (the weather is good at least 15 days), after the water treatment, the acrylic material will be constructed. The asphalt concrete is not less than 95%. Acrylic ground processing: Check the base surface First of all, the base surface of the foundation of acrylic is not covered by oil, and the oil slick has a certain effect on the mudflats of water-based acrylic course materials. Whether cement foundation ground or asphalt ground, the ground can not have loose, bulgy phenomenon. For loosening up problems in the ground, the general treatment method is to use the hammer, or is to use grinder to grind, ensure that the entire site present a compact, flat, and rigid plane. Revise the base surface Cement base surface must be polished and pickling, the con

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档