- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SBR沥青改性剂123(国外英文资料)
SBR沥青改性剂123(国外英文资料)
Test for design of waterproof design of bridge
1. The introduction
With the improvement of business quickly and road grade, highway overpasses and viaduct, negative bending moment of reinforced concrete beam and reinforced concrete bridge panel being repeated load of vehicle vibration and impact, the influence of the mechanical properties such as tensile, shear, and due to the expansion and contraction caused by the temperature, climate change, tend to produce fine cracks caused by bridge deck water seepage or leakage. The corrosion of the steel and the durability of the bridge. Especially the integration of a seam cast-in-situ concrete, although a variety of anti-cracking measures taken in the design and construction, but there is always the weak link, cracks, if do not take waterproof processing, will inevitably reduce the lifespan of the bridge. In order to prolong the service life of bridge, reduce maintenance costs and on the cement concrete bridge deck spraying a layer of waterproof coating, waterproof membrane formation, in order to achieve the purpose of the bridge deck waterproof is very necessary. Gb (5002-96) code for design of highway asphalt pavement and line standard JT014-97 highway asphalt pavement construction and acceptance standard requirements set in concrete of bridge deck pavement of the waterproof layer.
The zhanglong expressway is the highway of the national highway 319 zhangzhou to longyan, with a total length of 117.2 km, including the 313.2km of longyan project. The viaduct accounts for 40 per cent of the length of the line and is 3.8 km long. The segment of viaduct maximum longitudinal grade 4.7%, the maximum transverse slope of 7%, pier maximum altitude of 81 meters, maximum span of 155 meters, upper respectively continuous rigid frame bridge, prestressed concrete T beams and slabs structure, etc. Floor system USES cement concrete with the composite structure of asphalt concrete pavement layer, or layer in C40 steel
文档评论(0)