SSG200 型系列消防水鹤也称多功效消防给水栓(国外英文资料).docVIP

SSG200 型系列消防水鹤也称多功效消防给水栓(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SSG200 型系列消防水鹤也称多功效消防给水栓(国外英文资料)

SSG200 型系列消防水鹤也称多功能消防给水栓(国外英文资料) Throughput: 0.1 m3 / S. The turning radius of the outlet: R = 2500mm. For the turning Angle of outlet: a = 360 ° Interface flange: DN200 (gb91195-88), flange diameter 335mm. High ground: 3.8 m. Hole center distance 295 mm, aperture Φ 22, hole number 8. Installation USES relevant requirements: Should be installed in the open road, make the fire fighting vehicle have the leeway. The crane should be installed in the 100m-1000mm diameter and the pressure is on the 2.5kg water supply line, the amount of water will be about 10T/min. The product has automatic backwater device, installed in the bottom of the well cover, open the shaft of the shaft to start work, the work is finished cover the well cover, the water is automatically discharged. The ground is equipped with fire hydrant and manual rotating device. Fire crane structure diagram Feed water, rapid drain part This is when the fire truck is supplying water, opening the water valve and starting to feed the water. Completed water, turn off the water valve, stop water supply, drain off the riser at the same time more than water (for water supply valve of the above water riser in the water supply has been completed, and part of the remaining water. If the fire water crane is used below freezing conditions, over this part of the water freezes easily bilge bad riser, for will more rapidly in water after the water drainage in the base of fire water crane negative well below). ? We currently used by fire water crane, is closed at the end of the fire water supply water supply valve, open the drain valve and drain (most of the drainage is to open fire water crane covers first, then close the drain valve well, operate up more troublesome, sometimes easy to forget drainage, once forget, consequences). In order to optimize the operation link, reduce the unnecessary loss, in the design of fire water crane structure, had better water supply and drainage design a two functions or as one of the foot

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档