- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程签证单表格(_)(国外英文资料)
工程签证单表格(_)(国外英文资料)
Construction site visa
Engineering name: nanjing guotai industrial park earthstone project
The visa content construction will start at 2014-10-03 2014-11-15:
Date of declaration:
Visa number: 01
Visa for:
The channel is silt, the roads are ditches, the earth is dug and the ground is cleared
Description of the visa and the number of projects that occurred:
10-3, clean up the sundry two drivers A total of 20 hours
3 bulldozer field leveling A total of 30 hours
10-4 three drivers clear silt, clean up the construction waste a total of 30 hours
3 bulldozer is flat and level A total of 28.5 hours
10-5 three drivers clear silt, clean up the construction waste a total of 28.5 hours
3 bulldozer field leveling A total of 28.5 hours
10-6 three drivers clear silt, clean up the construction waste a total of 28.5 hours
3 bulldozer is flat and level A total of 28.5 hours
10-7 three drivers clear silt, a total of 28.5 hours
3 bulldozer field leveling A total of 28.5 hours
10-8 three drivers clear silt, a total of 28.5 hours
3 bulldozer field leveling A total of 28.5 hours
10-9 three drivers clear silt, a total of 28.5 hours
3 bulldozer field leveling A total of 28.5 hours
10-10 three drivers clear silt, a total of 28.5 hours
3 bulldozer field leveling A total of 28.5 hours
10-11 three drivers clear silt, a total of 28.5 hours
Four bulldozer field leveling A total of 38 hours
10-12 four drivers clear silt, paving, clean up the construction waste a total of 38 hours
Four bulldozer field leveling A total of 38 hours
10 to 13 four drivers clear silt, clean up the construction waste a total of 38 hours
Four bulldozer field leveling A total of 38 hours
Construction unit: (seal)
Agent: date:
Supervisor: (seal)
Agent: date:
Set up
Professional engineer:
Date:
Project manager:
Date:
Budget director:
Date:
Budget engineer:
Date:
Note: the budget director of the construction unit is valid after the final examination.
Construction site visa
Engineering name: nanjing guotai