导向架施工栈桥工法(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
导向架施工栈桥工法(国外英文资料)

导向架施工栈桥工法(国外英文资料) Assembly type cantilever guide frame construction trestle works Second engineering co., LTD One, foreword Suzhou long pier is located in the hangzhou bay sea-crossing bridge coast waters south beach area, extend from land to sea, the total length of 9.78 kilometers, is the suzhou cross-sea bridge, Ⅸ Ⅸ - A - B two blocks anti-washing construction of life channel, also is the worlds longest bridge construction. This bridge is designed by China railway group corporation. Hangzhou bay waters engineering geology is given priority to with silt clay, belongs to shallow sea semidiurnal tide sea area, tidal range is bigger, the rise time is long, large flow rate, the tide pier short effective time, steel pipe pile foundation construction and construction difficulty. Construction design and production of the fabricated cantilever guide frame fixing the pier foundation steel pipe piles, using the 80 t crawler crane with vibration hammer vibrating construction, successfully solved the sea pier construction problem, the formation of this method were summarized. The characteristics and scope of the work law Construction is not affected by the tide; Fast construction speed and ensure the accuracy and verticality of the pile. Operate platform with cantilevered guide frame, the personnel operation is safe and reliable. The vibration hammer vibrates the pile of steel pipe faster and sinks easily. Group of berley main girder, rear division block, front integral crane erection; Orthogonal cross-bridge panel modular construction, standardized operation. This method is suitable for the construction of piers in the area of haiti-beach area, cross river and sea. Third, the process principle Settled by using principles and bailey beam shear capacity, strong designed fabricated cantilever guide frame construction trestle steel pipe pile foundation, the orientation of water into land. Using all kinds of steel bailey truss girder and bridge deck module parts are connected in

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档