- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
导流(输水)隧敞开挖隐蔽工程阶段验收(国外英文资料)
导流(输水)隧洞开挖隐蔽工程阶段验收(国外英文资料)
A project of the abunchong reservoir
The tunnel excavation of the diversion tunnel is inspected
Reading book
The engineering tunnel excavation of the reservoir in abalbai reservoir is excavated
August 9, 2010
Reception and reception: red river state water conservancy bureau
Peoples government of shiping county
Generation institutions (e.g. sometimes) :
Design unit: the research and design institute of water conservancy and hydropower research in honghe state, yunnan province
Supervisor: yunnan hengcheng construction supervision co., LTD
Construction unit: yunnan hongyao engineering co., LTD
Equipment manufacturing (supplier) units: (no)
Quality and safety supervision organization: yunnan water conservancy and hydropower construction management station
Quality supervision station in red river state water and hydropower project
Operation management organization: arbaichong reservoir engineering authority, shiping county
Acceptance time: August 9, 2010
Acceptance site: the construction authority of arbaichong reservoir in shiping county
Before the speech
First, the acceptance basis
1, the specification
Acceptance regulations for water conservancy and hydropower construction SL223-2008
Quality inspection and assessment procedures for water and hydropower projects (SL176-2007)
The notification on the acceptance of the construction project of water conservancy projects in yunnan province (yunshui jianguan [2009] 57)
2, design documents
Water (diversion) tunnel construction (picture number) SP - abc-sn - sd-01 ~ 09
3, contract documents
Project construction contract document (contract number: sp-abc-sg - 01) in the reservoir highway and the diversion tunnel project in the city of shiping county, red river state.
The acceptance of phase ii shall include the following main projects
Check the image and quality of the project
Inspect construction of construction projects under construction
To examine the plans of follow-up projects and the implement
您可能关注的文档
- 大学计算机基础试题B(专)(国外英文资料).doc
- 大工10秋《修建施工》在线功课2(国外英文资料).doc
- 大工10秋《修建施工》在线功课3(国外英文资料).doc
- 大工11春《工程项目治理》在线功课2(含谜底)(国外英文资料).doc
- 大工11秋《水电站修建物》在线功课2(国外英文资料).doc
- 大工12春《工程力学》(二)在线功课3(国外英文资料).doc
- 大工12春《工程项目治理》在线功课2(国外英文资料).doc
- 大工11秋《钢筋混凝土结构》在线功课2(国外英文资料).doc
- 大工12秋《房屋修建学》在线功课2谜底(国外英文资料).doc
- 大工12秋《钢结构》 在线功课1(国外英文资料).doc
最近下载
- U8V11.1培训课件9U8V11.1新版功能介绍生产制造幻灯片.ppt VIP
- GB_T 9711-2023 石油天然气工业 管线输送系统用钢管.pdf VIP
- 1kv母线调试报告.pdf VIP
- 过滤实验-课件.ppt VIP
- GB_T 14264-2024 半导体材料术语.pdf VIP
- 消防系统的联动常见故障.ppt VIP
- (完整版)供应商合规管理制度 .pdf VIP
- JBT 12786-2016 升降工作平台 术语与分类.pdf VIP
- 2024东南亚电商市场报告.pptx VIP
- 第七单元 跨学科主题学习——项目开展,探究丝绸之路 学习任务单 苏科版初中信息科技七年级下册.docx VIP
文档评论(0)