室内回填土方施工计划(国外英文资料).docVIP

室内回填土方施工计划(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
室内回填土方施工计划(国外英文资料)

室内回填土方施工方案(国外英文资料) Basement room backfill construction plan Engineering profile The construction of the construction project of shaanxi wantai state construction project co., LTD. Is a construction project. The building is underground, with 33 shear walls on the ground. The project is carried out smoothly, reasonable arrangement of manpower, material force and material turnover, according to the characteristic of this project, the following construction plan is prepared. 1 backfill The site of this project shall be filled in: The floor of the skirt floor is filled with 1.3 m, and the main floor is backfilled with 0.9 m. 2.1.2 artificial, mechanical is solved by my project department. 2 backfill requirements and methods According to the drawings design requirements in the backfill sand, backfill quality directly affect the function such as warehouse, frozen room occupancy, corresponding parts can meet the design requirements, if the soil is not good or backfill construction quality is not high settlement may occur and result in the crack of the ground, can not meet the use function, it must be taken seriously. The backfilling principle According to the actual situation of the whole project, the backfilling principle and order is as follows: Backfill rule: first near the back (return to the area around the source point), first low and then high Soil to soil source using the forklift terminal area around backfill to finish first, and then in turn into the distance, plow the soil, the backfill shall be carried out in strict accordance with the specification in the process of compact, artificial water cement after the maximum use of forklift truck since the weight of soil, and make the compacted backfill effect. Construction technology 1 process flow Solid brick masonry wall to basement floor surface of the top level - in conjunction with the construction and supervision units on the basement floor shop acceptance - building clutter processing - layered soil, rake, ramm

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档