套井回填技妙策划(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
套井回填技妙策划(国外英文资料)

套井回填技术方案(国外英文资料) Filling quality inspection: when backfill material, often should check the soil condition of earth material, water content and soil thickness meets the design requirements, and the compacted dry density, water content and permeability sampling test, reflect the filling quality of all kinds of representative data. 5, check the method For project quality control, sampling inspection for engineering construction system, including the self-check and sample review, to review the qualified rate as the evaluation standard of construction quality of the sample. The check method has: On-site inspection, construction process, each hole each sample a set of backfilling depth of 3 m, to test the water content, dry density at the scene, and can not meet the requirement to rework processing, complete, every 10 hole, each a set of 5 m sampling, in the field water content, dry density, permeability coefficient test. Sampling review: group headquarters quality inspection and random sampling along the axis sets of well location, determination of water content, dry density and permeability coefficient, the reasonable measure set well the quality of backfill. The proof of construction strength According to the amount of design drawings, clay sets of 4679.1 m, the well according to the previous construction experience and the project design, a drill footage every day 35 m, plan 2 months to complete, plan construction period beginning on March 26, 2012 to May 2012 at the end of month end. It also arranges for two excavators, one for excavators and one for agricultural tractors (5m3) for transporting clay from clay materials. Third, safety measures Construction electricity safety guarantee measures The temporary use of electricity in construction site shall be implemented strictly in accordance with the provisions of jgj6-88 of the construction site temporary electricity safety technology. The installation, repair and demolition of temporary electrical power projects sha

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档