- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大跨度屋盖钢结构胎架滑移工法(国外英文资料)
大跨度屋盖钢结构胎架滑移工法(国外英文资料)
Large span roof steel junction frame sliding-work method
Submitted to the
information
material
Three innings of steel structure construction engineering company
Shenzhen jiansheng and steel structure construction engineering co., LTD
Large span roof steel junction frame sliding-work method
One, foreword
With the boom of the national economy, the large span space structure is booming, architects design is more and more bold, displays in: span bigger and bigger, more and more novel and chic modelling, more and more complex structure. At the same time, the pace of modern life is rising fast, the market conditions are changing rapidly, and the demand of the owner for the period of construction is higher and higher. The traditional construction technology have been unable to meet the needs of construction, the construction units to take various measures to construction reform: increase large machinery equipment, reform the management system, increase labor and labor time, but the solutions are unable to make the construction conditions change radically. And construction technology of change become inevitable, slip, used for overall ascension, such as Bridges connect outfit ever built Bridges and structures technology began to used in the construction of large-span structure, and has achieved considerable economic benefits and social benefits. Shenzhen built up and the steel structure building installation engineering co., LTD. In recent years, constantly in the process of the basic train of thought, combines the characteristics of the project itself. In 99 by piecewise altitude assembling, shard truss sliding process successfully installed the shenzhen airport terminal phase ii expansion and won the national method, respectively in 99 and 99, using jig sliding process and the whole slip curve the successful construction of shenyang taoxian airport terminal and guangzhou baiyun international airport terminal, summarized a set of about different co
文档评论(0)