- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
塑性砼防渗墙施工技妙策划(国外英文资料)
塑性砼防渗墙施工技术方案(国外英文资料)
Construction technology of the plastic concrete anti-seepage wall of dam
First, preparation for construction
(a) survey and geological conditions, complex can be within the scope of the project, find out the geological, formation, soil and hydrology situation, for choosing the mud circulation process, such as slot length to provide reliable technical data, and cut-off part to ascertain the underground obstacles.
(2) clearing the ground: the site is levelled and excavated the underground obstacles within 3 meters of the ground floor.
Test (3) : in similar area to the construction site engineering geological conditions of the experiment, in order to obtain pore, solid wall mud, such as wall pouring construction technology and parameter.
Construction plan:
Total length of 3.780 km, the block reservoir cut-off wall 30 cm thick, plastic concrete cut-off wall reference mixing ratio of cement, sand, gravel, clay, bentonite: water = 135, 640:920-145:70-280 (weight ratio). Construction can be adjusted according to field test parameters, which made the density of plastic concrete cut-off wall for 19 ~ 21 kn/m3, the elastic modulus value in 200 ~ 1000 mpa, deformation has better adaptability, 28 days compressive strength value is greater than 2 mpa, into a wall after the permeability coefficient is less than 1 x 10-6 cm/s, allowing greater than 60 seepage gradient.
According to the experience of the construction of the anti-seepage wall in similar areas, and according to the design requirements, we have worked out the overall construction plan for the dam of the main dam.
(1) using the ct-30 percussion drill to drill into a groove;
(2) adopting bentonite mud wall;
(3) the barrel method replaces the mud hole;
(4) the use of on-site mixed concrete;
(5) the concrete of the helicopter under the mud;
(6) steel wire rope auxiliary concrete pouring;
Third, construction craft, method
Using the drilling and splitting hole, the impact drill is made into the groove,