- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
回填土技巧请求(国外英文资料)
回填土技术要求(国外英文资料)
3, earthwork backfilling,
3.1 operation conditions
After the exterior wall is removed, the waterproof layer and the waterproof protection layer are finished. Before returning, the water in the foundation pit should be drained, garbage, silt, floating soil and so on. The parts of the chamber are not affected by the construction period, but can be carried out during the construction of the upper main body.
3.2 soil preparation
In the abandoned soil, choose the earth source, and its soil USES clay or powder clay. No more than 30cm stone, organic waste, brick etc.
3.3 machines and tools preparation
The construction equipment used for backfilling is like table 6-2-1.
Table 6-2-1: construction equipment for backfilling
The serial number
Machine name
The number of
use
one
Frog hammer
Two (2)
The main ramming equipment
2
Human tamper
four
The tamping machine cant be tamped down with the compaction or the hammer
3
Wooden hammer
eight
4
A cart
20
The level of transportation
5
drivers
1
loading
6
Forklift.
2 a
loading
7
Dump truck
6 m
The level of transportation
8
A small truck
10 two
The level of transportation
9
A spade
The 40
Whole and short distance transportation
3.4 technical preparation
The contractor, technician and operator of the project are engaged in the technical background, and the project security personnel are in the background of the safety, forming a written record.
The outer wall is marked with the thickness of the thickness of each layer, requiring no more than 300mm in thickness.
Construction technology
3.2.1. When backfilling, strictly control the water content of the backfill soil, which is appropriate for holding the ball in a group and falling to the ground.
3.2.2. In order to control soil thickness, outside the wall thickness of each layer virtual earth mark, thickness of each layer virtual earth take 300-350 - mm, few mechanical tamping cannot reach place, with human tamper, virtual soil thickness is reduced, take 200-250 - mm. When