国家水准测量依精度不合分为一(国外英文资料).docVIP

国家水准测量依精度不合分为一(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
国家水准测量依精度不合分为一(国外英文资料)

国家水准测量依精度不同分为一(国外英文资料) The national level measurements are divided into one, two, three, four, etc. A, is the national second-class leveling elevation control comprehensive foundation, three, four etc. Leveling directly for topographic mapping and various engineering construction to provide the necessary height control. The level of accuracy below four is called an iso-level measurement. This section describes the layout, technical requirements, the selection of the buried rock, the external industry and the calculation of inner industries. The form of the layout of the standard route The route taken by the level origin or any known elevation point is called the standard route. The standard route requires a fixed point at a certain distance, called a level point. The goal of leveling is to measure the elevation of the level points along the selected level line by the known elevation point. According to the situation of the known level and the actual needs of measuring work, the standard route can be set in three forms. (1) the level of the line: from the level of a known elevation, the standard measure is carried out to the level of another known elevation. (2) closing level line: starting from the bench mark of a known elevation, along a circular route for leveling, determining the elevation along sheung shui on time, finally returned to those on time. (3) A level line, starting from the bench mark of a known elevation, along a level measurement along the route other leveling point elevation, finally with any known elevation point measurement. In order to improve the accuracy and reliability of the results, the code level line must be observations or one-way double point back and forth, and should limit the length of branch level line. (4) level net The main technical requirements of the measurement of two, four, etc The leveling of the instruments used by type, level line length, discrepancy or closure of the limit of poor have corresponding regulation, four etc

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档