回填土(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
回填土(国外英文资料)

回填土(国外英文资料) The safety technical measures and the table number of the five companys safety technical measures and plans: The name of the project I hope the British city-states sales department Clarificaiton site Mianzhu project department Sign by clarificaiton Package name The backfill scheme is at the bottom Disclosure forms The meeting format Time of disclosure Safety technical measures and the contents of the scheme Section 1, backfill construction schedule According to actual condition, this project adopts the piled up near the site of the original soil as a source of backfill soil, elevation of backfill soil must be controlled well, backfill must stay until they have passed the acceptance of backfilling. According to this project, the backfill will be returned from one side to the other, so as to facilitate the construction of running water. Section 2, construction preparation and operating conditions 1, construction preparation, (1) prepare the machine tools in advance to meet the requirements of construction according to the time of filling and filling in different parts and stages. For example: the frog rammer, the flat vibrator, the cart, 2m by ruler. (2) according to the design, the quality of the soil and the amount of reclaimed soil are required, and the source of the soil and the time of use are put into practice. (3) arranged backfill construction workforce, organization operation team, completes the construction technology of bottom, for CRD construction task in human resources. 2, operation condition (1) remove the rubbish, water, organic matter, scattered materials, etc. The construction of reclaimed soil can be carried out after inspection of the underground structure, and the waterproof and waterproof protection layer is finished and checked. (2) before reclamation, the measurement shall be made to control the thickness of the pavement. Section 3, construction method 1, the first floor method is all: (1) the soil compacted; (2) 100 thick C15 conc

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档