回填土取样标准(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
回填土取样标准(国外英文资料)

回填土取样标准(国外英文资料) Number of samples Samples of soil samples shall be carried out according to the existing national standards and the existing standards of the industry or region. (a) on the basis of the construction foundation engineering construction quality acceptance specification (GB50202-2002) and specification for design of building foundation (GB50007-2002) sampling in the process of the filled soil compaction, stratified sampling shall examine the dry density and water content of soil. There should be a test point in every 50-100m2 area, and the compaction coefficient is obtained according to the test results. Ring (cutting) (2) sample from jgj79-2002 When sampling the quality of the soil sample mat, no less than one test point for every 50-100m2 of the large foundation pit. No less than one point per 10-20m for the base tank; Each individual cylinder should be no less than one point. Ring (cutting) 1, the whole piece of cushion layer (1) the area is less than or equal to 300m2; The ring knife method is 30 to 50m2; The injection method is arranged for 10-15m2. (2) the area 300m2; The loop-knife method is a 50-100m2 layout; The injection method is 20 to 30m2. 2, strip foundation layer (1) refer to the whole cushion layer. (2) the ring knife method is assigned at least one per 20m; The injection rate is at least one per 5m. A separate foundation layer (1) refer to the whole cushion layer. (2) there are no less than two points on each individual base. (4) sampling according to the urban road project construction and acceptance discipline (dbj8-225-1997) Earth roadbed and lime layer test frequency: each layer 1000m2 measure one group, each group three points. Ring (cutting) Sidewalk roadbed and dirt shoulder test frequency: 2 points per 100 megabytes. Ring (cutting) Gravel, gravel pad, and trislag check frequency: 1 point per layer 1000m2. (sand filling method) Primary test frequency: 1 point (ring tool) per layer 1000m2 Import and export slope soil test freque

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档