加气混凝土砌块墙施工计划(国外英文资料).docVIP

加气混凝土砌块墙施工计划(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
加气混凝土砌块墙施工计划(国外英文资料)

加气混凝土砌块墙施工方案(国外英文资料) 3.13 building light concrete walls 3.13.1 lightweight concrete block overview: Lightweight concrete block on cement, lime, sand, fly ash, aluminum powder as raw materials, such as fine grinding, measuring ingredients, stirring casting, gas expansion, autoclaved curing, static stop cutting, finished product storage process and have qualitative light, high strength, durable, heat preservation, sound insulation, fire prevention, impermeability, good anchorage performance of lightweight concrete block. It is suitable for the masonry of interior and exterior wall in construction projects. 3.13.2 material requirements * lightweight concrete block: a 200mm or 100mm thick reinforced concrete block with a strength grade of A5.0, dry weight (dry density) is less than 7.5 KN/m3. * cement: use 32.5 grade Portland Portland cement or Portland cement. * sand: in medium sand, not more than 5 percent of mud, using the sieve of 5mm aperture. * adhesives: using polyvinyl alcohol, which is 107. * other 6 reinforced concrete, wood and brick, Φ, anchor plate (75 mm x 50 mm x 2 mm), grilled nails, etc. 3.13.3 main machine tools Mechanical equipment: mortar mixer, tower crane, construction elevator, etc. Main tools: the knife, the crowbar, the wooden hammer, the line drop, the grey slot, the hand roller car and the block fixture etc. Condition 3.13.4 Before the masonry, the wall should be well received; The floors of floor, ash and other parts of the wall of the concrete wall should be cleaned up. * the site should be packed with solid, flat and no water, and should be kept in order, with a height of not more than 1.8 m. The shipping process is lightly placed to avoid damage. And minimize secondary reshipment * on the structural wall, the column is played with the high level of the 500mm horizontal line, the gas concrete wall and the line of the door. * make the floor mat: at the bottom of the block wall, the kitchen and toilet must be poured in 200mm high C20 concret

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档