功课(1、2)谜底(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
功课(1、2)谜底(国外英文资料)

作业(1、2)答案(国外英文资料) Lets go to the first chapter The form of sheet piling support structure is in the form of (). A bending destroys B anchor to destroy the C support and the D pile is sinking To prevent the effect of precipitation on neighboring environment, the measures should be taken. A backfilling point method B deep mixing method C press the D freezing method E layer bolt The characteristics of earthwork construction are (). The construction speed of the large C construction period is complicated In light well point systems, the arrangement of planes is (). A single row of well point B double row well, point D, point D, point D The effect of precipitation on well is mainly (). A steady slope B prevents the inflow C from increasing the transverse load D to prevent the flow of sand from the pipe It is () that can be used as the packing below the surface. A broken turf B clay soil C rock, ground D blasting slag E sandy soil Non-gravity supporting structures are (). A stud B steel pile C H type pile C H type pile of concrete pile E The reason for the increase in shear in the wall of the pit wall is (). A pile of heavy weight on the top of A hill has been subjected to the use of A heavy load of C earth, which has been exposed to water from the surface of the earth The main factors affecting the quality of the fill are (). The type C of A compaction B machine is the amount of water of D soil and the thickness of the soil When earth is filled in, the commonly used compaction method is (). A water irrigation method, B, C, and C There is no soil () to fill the soil. A silt B sandy C expands soil D organic matter more than 8 percent of earth E containing water soluble sulphate more than 5% soil To improve the efficiency of the bulldozer, adopt () the method of construction. A circle line B multiple shoveling C downhill pushing the earth and pushing the earth The permeability of soil is mainly dependent on (). A groundwater permeation distance of the length of B soil When

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档